Laserfiche WebLink
<br />Memo - San Luis Logistics <br />page 3 <br /> <br />(e) Open Pit / Adit connection study (Schreiner, Stevens, Peidleton, <br />Pcsey, Ihlenfeldt, Nelson, etc.) <br />New ground water geochemistry born holes monitoring wells <br />Modeling techniques applicable <br />Ground dater flow <br />Geochemical & hydrechemical modeling <br />Examination of Reynolds edit (underground tour) <br />Open pit <br />Existing configuration <br />Possible backfilling / excavation ooticns <br />(f) Portable Interim Treatment Plant (All) <br />Collection system for effluent to be treated <br />Reynolds Adit <br />Iowa Adit <br />North Waste Pile ('> <br />Metals removal results to date <br />Storage of Reagents & Floculant (Freeze problems) <br />Storage of sludge at plant <br />Transport & disposal of sludge at help pad <br />Lightning strike protection <br />Maintenance and operation of PITS during winter <br />(g) Modifications to ;dater Treatment Plant (001) <br />Permit approval <br />Acau~<,ition 3 delivery of ?cuiDment <br />Progr?5S Of mOd1~1C3t'~Cni <br />CcmD'idnCe '.vl Ll iChe7Ul2 (mid_')C -COer terror: <br />F3'1-idr? r2?St3dliShmenL Cf i7'~ gpm iT?aim2Ci !'ir.J1`. <br />(h) In$i311dL10n Of ry3nlde DetGxl*iC3ilOn ?QUIDment <br />instaliaiion of equipment in metallurgical plani <br />Snake dean operation <br />Henn Leacn fluid cycling <br />(1) Land appllcat'On (SCnreine`, ?Ci?;/, P1GGn 2.', ')leli:,n, _hl ?nfe~'7 t) <br />Area ., <br />Requir?d ,Reclamation aciiviiv <br />4oniioring facilities deacti~;an on plans <br />Fuiur? Laid °oolication ?css~biliiies <br />'/lilt prJ00i?~ ~.re3 <br />;i3tUi cf plans <br />Cosign considerations <br />(j) Tour- cr" biigr-man Fork c.Aill <br />,,• f r'me all.c.vS (?'lo:•~ at Teas' Z hours) ••, <br />(7) WOif Creek Ski I_rjpy2 ~.g/'] 3 9/i5 - ?cs?y, Pendl?t~Cn, Schreiner. St?~/2nS, <br />Sorenson?) '.-3GG-374-0415 <br />