Laserfiche WebLink
One enforcement action has been issued for Foidel Creek since the last permit renewal, RN-03. Notice <br />of Violation CV-2001-004 was issued to Twentymile Coal Company on March 22, 2001. This violation <br />was issued for failure to conduct water monitoring in accordance with the approved plan, and failure to <br />maintain a damaged water monitoring well, 97-12M. This violation has not been terminated at the time <br />of this midterm findings. <br />II. Revisions to the Permit: <br />One permit revision, one technical revision and three minor revisions have been approved since the last <br />permit renewal. The most recent permit renewal, RN-03, was approved April 24, 2000. The Division <br />approved Permit Revision No. 5, to allow for expansion of the Foidel Creek Mine plan into the Northern <br />Mining District, on June 28, 2000. These recent permitting actions resulted in updates to many portions <br />of the permit. <br />Revision tvoe Revision description Decision date <br />MR 169 NMD Power Borehole Modifications 8/14/00 <br />MR 170 Add Diesel Tank, Modify 12 R Long wall Panel 11/27/00 <br />MR 171 Alternate Location for 14 Right Gate road 3/2/01 <br />PR 5 Northern Mining District Permit Revision 6/28/00 <br />RN 3 Permit Renewal #3 4/24/00 <br />TR 37 Add NMD Power Drop Facility 6/14/00 <br />III. Stipulations: <br />The following two stipulations were previously attached to the permit. These stipulations remain active. <br />St~i ulation No. 11 <br />PRIOR TO APPROVAL OF ANY MINING-RELATED ACTIVITIES WHICH WOULD POTENTIALLY AFFECT <br />LANDS IN THE NORTH 1/2 OF SECTION 10, TSN, R86W OR THE SOUTHWEST 1/4 OF THE SOUTHWEST <br />1/4 OF SECTION 33, T6N, R86W (THROUGH FUTURE PERMIT REVISION OR RENEWAL THE PERMITTEE <br />WILL SUBMIT ACCEPTABLE RIGHT-OF-ENTRY INFORMATION TO THE DIVISION. <br />Stipulation No. 46 <br />IN CONJUNCTION WITH MR-106, TCC WILL SUBMIT SURVEY ELEVATION DATA FOR THE PIERS (OR <br />FLOORS) CONSTRUCTED FOR THE PREPARATION PLANT FOUNDATION TO DEMONSTRATE THEY ARE A <br />SUFFICIENT DEPTH BELOW THE FINAL APPROVED POST-MINING TOPOGRAPHY TO DEMONSTRATE THAT <br />NO ADDITIONAL BOND MONEY WOULD BE NECESSARY TO COVER DEMOLITION .4T FINAL <br />RECLAMATION. <br />The following stipulation was previously attached to the permit but was complied with upon submittal <br />of the proof of the resolution of the Pittston Settlement Agreement June 27, 2000. <br />Foidel Creek Mine, C82-056, Midterm 2000 <br />