Laserfiche WebLink
<br />RECLAMATION COST SUMMARY eant'd sheet 4 of 4 <br />C. PORTAL/SHAFT SEALING <br />Task No.~ Task Descrlp[lan ~ Cost (f) <br />Slbtotel (K): <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Teak Mo.~ Task Description ~ Cost (f) <br />Subtotal (L): <br />vccceccv- <br />N. MISCELLANEOUS RECWIATIOM TASKS <br />Task No.~ ~ Task Descriptlan ~ Cost (f) <br /> <br />4 ~ Deenlltion ~ f60, 167 <br />6 ~ Seedtrg ~ (122,980 <br />Ferc(ng <br />7 ~ Mob/Dmb ~ f1,230 <br />Subtotal (M): (184,377 <br />TOTAL DIRECT RECLAMATION COSTS (sib[otels A through M):c- f887,G70c <br />li. INDIRECT COSTS <br />A. CONTRACTOR'( OyERMEAD i PROFIT <br />ltem Mo.~ Item Description ~ Cost (f) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ f13, 756 <br />2. ~ Contractor's Performente Bond 0.975% of dir. ~ (8,653 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 588,747 <br />4. ~ Job Superintendent.. <br />Slbtotal (A): (111,156 <br />TOTAL COIISTRUCTION CONTRACT AMOUNT (direct plus 0 i P):c f998, 626 <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item Mo.~ Item Description ~ Cost (f) <br />I ..-- I <br />1. ~ Mirorels Program Admin. Fee at 5.00% of cntr.~ f49, 931 <br />MET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 549,931 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): (161,087 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): (1,048,557 <br />