Laserfiche WebLink
<br />YNEEL LOADER FAST i PERFORMANCE DATA YORKSNEET cont~d <br />Model: GT 950E .(1993) <br />ADJUSTED COST SUBTOTALS <br />sheet 2 of 2 sheets <br />I.°___.°._____.... ~ ~ <br />~----^-----•-----•----------- Duterah ip Costa ----------- Overhaul i ratl Cosa <br />~ Loader, Attachments !1 f r2: ~ Loader i Attachnent /1: <br />Sirple ehifts f8.89 f5.61 f4.12 f1.49 f3.26 51.85 52.67 f5.15 <br />Double shifts f6.67 f2.80 f2.06 Attsehamt Q: <br />Triple shifts f5.93 f1.87 f1.37 f0.00 f0.00 f0.00 f0.00 f0.00 <br />HOURLY OPERATOR VALES <br /> Base Frl npe <br />Labor CLassif icatian Rate Benefits <br />Loader operator (<=6ey) 515.02 f3.% <br />Loader operator (> 6cy) (15.17 f3.% <br />Mechanic ~ f15.32 f3.% <br />f1.56 f2.i1 50.26 <br />f0.00 f0.00 f0.00 <br />F.I.C.A Unespl. Yk.Cap. Total ~ Shift <br />7.70>< 6.20X 12.SOX (f/hr)I Differential <br />f1.16 f0.93 f1.88 f22.95 ~ Day 50.00 ~ 2 chift/day evy.: f0.15 <br />f1.17 f0.94 f1.90 (23.13 ~ SwinR: f0.30 ~ 3 shift/day evq.: f0.25 <br />f1.18 f0.45 f1.92 523.32 ~ Mi pht: f0.45 <br />HOURLY EDUIPMEMT COST 51MIARY <br /> Ownership ~---Operet inB d Overhaul Costs--~ Operator <br /> Costs ~ <br />ce Loader, Att./1 Attachment I2 ~ Costs <br />I <br />Single shifts = =r=_ =I <br />(18.62 =_ c::eeccr_co l <br />f18.65 :v:=ee===== :::Icc <br />f0.00 :::eceeceee=e~ <br />522.95 <br />Double shifts (11.53 (18.65 f0.00 523.10 <br />Triple shifts f9.17 f18.65 f0.00 523.20 <br />Total <br />Cost/MR (5) <br />560.21 <br />(53.28 <br />f51.01 <br />-____ :eeee::e`eee=_ a:ee.::::eee.-e _eee_~_:::eeee.: e::caeca-.:e_eeeeee_ _==:::e:e...eeeeee...:::e:eeeeeee:::..::: ___ <br />EWIPMEMT PERFORMANCE DATA <br />- - - EWIPMENT SPECIFI GTId15 - - - <br />I-------------D(mensiare <br />Mechi ne Meke t Model I Trerrr.ise ion I Fuel Type I Xoreepower ~ Lenpth I Yi dth <br />---------------------- I --------------- I----------°-- I------------ I ----°----- I °--------- <br />CAT 950E (1993) Power shift Diesel 170.0 25.25 9.25 <br />I Clearance I-Capacity (tu. yds.)-I Mex. Loedi n8 <br />I Type I Circle (ft.)~ Struck Heaped I Xeipht (ft) <br />I________________I._________-..I.________.I_°--_....I-_____°.._._ <br />Loader Bucket: GP w/teeth 45.42 3.01 3.50 9.00 <br />GROUND SPEEDS (fpm) ~ Rated Engire RPM <br />Transms. Geer: 1st 2rd 3rd 4th <br />forward: 370 669 1,170 1,971 <br />reverse: 414 730 1,285 2,174 <br />(fU°--------' I <br />I xeipht I Yeipht (tare) <br />-- I------------ I --------'----- <br />11.50 17.01 <br />I Basic Cycle Time I <br />(load, arnr, aknp) I <br />~------°____---'---- I <br />0.49 min. <br />