My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47069
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:46 PM
Creation date
11/23/2007 3:07:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
12/31/1986
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF STIPULATIONS <br />Stipulations 1, 2, 3 and 5 below were part of the original permit, approved <br />September 23, 1981, and will be carried into the new permit term. Stipulation <br />number 4 was issued as part of the Wolf Creek Permit Revision (September 25, <br />1984). One new stipulation was attached to the permit during the renewal <br />process, which relates to reclamation bond submittal and amount. All <br />stipulations will become a binding part of the permit upon final issuance. <br />IF DURING THE COURSE OF MINING OPERATIONS, PREVIOUSLY UNIDENTIFIED <br />CULTURAL RESOURCES ARE DISCOVERED, THE PERMITTEE SHALL INSURE THAT THE <br />SITE IS NOT DISTURBED AND SHALL NOTIFY THE COLORADO MINED LAND <br />RECLAMATION DIVISION AND THE UNITED STATES OFFICE OF SURFACE MINING <br />(OSM). THE PERMITTEE SHALL INSURE THAT THE RESOURCE IS PROPERLY <br />EVALUATED IN TERMS OF THE NATIONAL HISTORIC PLACES ELIGIBILITY CRITERIA <br />(36 CFR 60.61). SHOULD A RESOURCE BE DETERMINED ELIGIBLE FOR LISTING ON <br />THE NATIONAL REGISTER, APPROPRIATE MITIGATION MEASURES WILL BE DEVELOPED <br />AND IMPLEMENTED IN CONSULTATION WITH THE STATE HISTORIC PRESERVATION <br />OFFICER (SHPO), THE BUREAU OF LAND MANAGEMENT (BLM), THE OFFICE OF <br />SURFACE MINING (OSM), AND THE MINED LAND RECLAMATION DIVISION (MLRD). <br />WITHIN 90 DAYS OF ITS PUBLICATION, A COPY OF THE UNITED STATES GEOLOGICAL <br />SURVEY'S LYSIMETER STUDY MUST BE SENT TO THE DIVISION AND OSM TO PROVIDE <br />ADDITIONAL QUANTITATIVE DATA ON FLOW RATES AND WATER QUALITY OF THE SPOIL <br />LEACHATE. <br />A LIST OF PROPOSED SEED MIXTURES MUST BE SUBMITTED ANNUALLY TO THE <br />DIVISION FOR REVIEW AND APPROVAL. THE LIST SHOULD INCLUDE PURE LIVE SEED <br />(PLS) PER SQUARE FOOT, POUNDS PLS PER ACRE, SPECIES ORIGIN, AND ACRE <br />ESTIMATES TO BE SEEDED FOR EACH MIX. <br />4. A OUALIFIED REGISTERED ENGINEER SHALL PERFORM INSPECTIONS AT LEAST <br />BIMONTHLY DURING THE CONSTRUCTION AND PLACEMENT OF THE UNDERDRAIN (AT THE <br />WOLF CREEK FILL). RECORDS OF THE INSPECTIONS ARE TO INCLUDE DATE, TIME, <br />INSPECTOR AND OBSERVATION. COPIES SHALL BE RETAINED AT THE MINE SITE. <br />AFTER COMPLETION OF THE UNDERDRAIN CONSTRUCTION, COPIES OF THESE <br />INSPECTION REPORTS SHALL BE SENT TO THE DIVISION. <br />THE 110 FOOT FILL EMBANKMENT ON THE MAIN HAUL ROAD MUST BE INSPECTED <br />ANNUALLY, OR WITHIN 10 DAYS FOLLOWING ANY STOR14 WHOSE BACKWATER ELEVATION <br />EXCEEDS THE ELEVATION OF 5941.1 FEET ABOVE SEA LEVEL (10-YEAR, 24-HOUR <br />MAXIMUM STORM EVENT'S PROJECTED BACKWATER ELEVATION) BY A QUALIFIED <br />GEOTECHNICAL ENGINEER OR ENGINEERING GEOLOGIST. A LETTER OF <br />CERTIFICATION CONTAINING THE RESULTS MUST BE SUBMITTED TO THE DIVISION <br />WITHIN 2 WEEKS FOLLOWING THE INSPECTIONS. <br />6. A PERFORMANCE BOND IN THE AMOUNT OF 56,431,188.00, PAYABLE TO THE STATE <br />OF COLORADO AND THE UNITED STATES OF AMERICA, MUST BE FILED IJITH THE <br />DIVISION WITHIN FIVE DAYS AFTER THE DECISION BECOMES FINAL. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.