Laserfiche WebLink
Table of Contents (continued) <br />Page <br />XV. Operations Description - Rules 2.05.2, 2.05.3(2) and 4.01 36 <br />XVI. Explosives - Rules 2.05.3(6) and 4.08 37 <br />XVII. Backfilling and Grading - Rules 2.05.3(3), 2.05.3(4), <br /> 2.05.4(2)(a), 2.05.4(2)(c), 4.09, 4.13 and 4.14 37 <br />XVIII. Coal Processing Waste and Non-Coal Processing <br /> Waste - Rules 2.05.3(8), 2.05.4(2)(f). 4.10 and 4.11 40 <br />XIX. Mine Facilities, Coal Handling Structures, Support <br /> Facilities - Rules 2.05.3(3), 2.05.3(7) and 4.04 40 <br />XX. Roads - Rules 2.03 and 4.03 41 <br />XXI. Bonding - Rules 2.05.4(2)(b) and 3 41 <br />XXII. Sealing of Drilled Holes and Underground Openings - Rules <br /> 2.05.4(2)(8) and 4.07 43 <br />XXIII. Subsidence - Rules 2.05.6(6) and 4.20 43 <br />XXIV. Special Categories of Mining Other Than AVF and Prime <br /> Farmland - Rules 2.06, 4.22, 4.23, 4.26, 4.27, 4.28 and 4.29 43 <br />XXV. Miscellaneous Compliance - Rules 2.05.6(5), 4.02, <br /> 4.12, 4.19, 4.21, 4.28 and 4.30 43 <br />XXVI. Operations on Land Subject to Limitations or Prohibitions - <br /> Ru1es 2.03.7 and 2.10 43 <br />XXVII. Demonstration that Surface Coal Mining and Reclamation <br /> Operations can be Feasibly Accomplished - Rule 2.07.6(2)(b) 44 <br />XXVIII. Compatibility with Anticipated Adjacent Operations - Rule <br /> 2.07.6(2)(1) <br />............. .. 44 <br />XXIX. Reclamation Fees Required by 30CFR, Chapter VII, <br /> Sub-chapter R - Rule - 2.07.6(2)(0) 44 <br />_ii_ <br />