Laserfiche WebLink
-39- <br />It will be important to clearly present the results of the visual and survey <br />monitoring programs at the Coal Ridge No. 1 Mine. The amended application <br />presents no detail regarding the format of the semi-annual subsidence <br />monitoring reports. In the interest of facilitating complete and efficient <br />presentation of the accumulated subsidence monitoring data, the Division <br />imposes the following stipulation upon the permit approval. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS THE PERMITTEE TO PREPARE AND SUBMIT A FORMAT FOR <br />THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING REPORTS. THIS <br />PROPOSED REPORT FORMAT SHALL BE SUBMITTED FOR DIVISION REVIEW WITHIN <br />SIX MONTHS FOLLOWING ISSUANCE OF THE PERMIT. FURTHER, THE PERMITTEE <br />SHALL HAVE OBTAINED APPROVAL OF THE SUBSIDENCE REPORT FORMAT PRIOR TO <br />ANY MINING WITHIN THE COAL SEAM. <br />With satisfactory resolution of the above stipulation, the proposed operation <br />will be in compliance with the requirements of this section. <br />XXV. Special Categories of Mining (Other than AVF and Prime Farmlands) - <br />Rules 2.06, 4.22, 4.23, 4.27, 4.28, and 4.29 <br />The only special category of mining that applies to the proposed Coal Ridge <br />No. 1 mining operation is steep slope mining. Portions of the proposed permit <br />area qualify as steep slope mining areas, exhibiting slope gradients in excess <br />of 200. Portions of these steep slope mining areas will be subsided during <br />the first five year permit term. Based upon the information contained within <br />the permit application and with satisfactory resolution of the stipulations in <br />Section XXII (Subsidence) of this findings document, the proposed operation <br />will be in compliance with the requirements of this section. <br />XXVI. Miscellaneous Compliance - Rules 2.03.3, 2.05.6(5), 4.02, 4.12, 4.19, <br />4.21, 4.28, and 4.30 <br />The applicant has met the requirements for format and supplemental information <br />as shown on pages 1-1 through 1-7, and pages 2-=3 through 203k of Volume I. <br />No surface mining is planned near underground mines. Signs and markers will <br />be installed in compliance with Rule 4.02. <br />The Division finds the proposed operation in compliance with the requirements <br />of this section. <br />