Laserfiche WebLink
l~h~ <br />-1- <br />Stipulation IJo. 5 <br />U. S. STEEL SHALL SU6~1IT A STUDY OF NOISE LEVELS, NOISE SDUP,CES, AiJD <br />METHODS (if any) THAT COULD BE USED TO MITIGATE NOISE Ih1PACTS (if any) <br />AT THE PROPOSED SOMERSET VEIJTILATIOtt FAfJ ALONG HUBBNRD CREEK PRIOR TO <br />O THE C'OtJSTRUCTIDtJ OF THE FACILITY. THE STUDY SHALL BE CONDUCTED IN <br />COtJSULTATIOIJ WITH THE USFS, OSM, AND THE DIVISIOi•t. U.S. STEEL SHALL <br />It•1PLEMENT NOISE ABATEMENT 1~1EASURES (if practical) THAT ARE RECOMMENDED <br />IIJ 7HE STUDY AfJD IN CONSULTATION IJITH THE U.S.r".5., O.S.M., AND THE <br />DIVISION 41ITHIIJ 90 DAYS AFTER COMPLETION OF THE FAN FACILITY. <br />ACCEPTED AND AGREED: i•IINED LAfr'D RECLAh1ATI0N DIVISIOW <br />COLORADO DEPARTP1EfJT OF <br />tJATURAL RESOURCES <br />%'~ <br />%~ <br />•;' ' ~ , <br />By,% '~ ~-'>>~en. Superintendent -~ <br />Operator Title ,/ <br />~/ j <br />' ivision Director .-, ~ -~•`,_. <br />~%- <br />AG „1 pha No. IJR LR T'i6 <br />AG File No. PiJR/3928/JD <br />/e p <br />Doc. No. 6142 <br />