Laserfiche WebLink
__ ~. <br />Memo to Mike Boulay <br />Lower Sylvester Gulch Road <br />page 2 <br />piezometers should be installed in the location of the suspected <br />ground water problem areas, prior to installation of the french <br />drains. In this manner the impact of the drain installation can be <br />ascertained. <br />I assume that MCC, under its construct, monitor and remedy action <br />plan intends to proceed with the proposed amended construction. I <br />recommend that you forward this comment for their immediate <br />consideration. <br />cc: Dave Berry <br />doc: M:\Coal\JAP\mtgllsgr.wp5 <br />JP/Jp <br />