Laserfiche WebLink
~~. ~ <br />SHERIDAN EN'I ERPRISES, INC. <br />9746 Fast E3B.mpclan Avanua <br />No. 350 <br />Danvar, Colorado 80831 <br />(303) 751-0093 <br />III IIIIIIIIIIIIIIII <br /> <br />G F'~ ~ ,~ <br />February 21, 1983 <br />Mr. Jim Herron <br />Colorado Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />..Ln ~.~~ ~~: ... ..'L .:.. .-r. <br />Re: Stipulations - Mining Permit No. C-004-80; <br />McClane Canyon Mine - Salt Creek Mining Company. <br />Dear Mr. Herron: <br />Pursuant to our telephone conversation of 2/17/83, this correspondence <br />should clarify whatever questions exist relative to McClane Canyon <br />stipulations. <br />A water monitoring program has been initiated, and includes analysis and <br />SfL ft3 ~ reporting of NPDES permitted sites. This program will be continued for the <br />~' life of the operation. <br />Some discussion transpired between you and our project engineer, John Walters, <br />,~ ? as to the location of the new monitoring site on East Salt Creek. The <br />St ~ 3 ~ location will be presented to your office on an appropriate scaled map for <br />approval prior to installation. This matter should be resolved in the very <br />near future. <br />Soil samples have been taken in the fill areas and we are presently awaiting <br />analysis. It was stipulated that the sampling and analysis was to be accom- <br />plished within 5 months of permit issuance and obviously we have failed to <br />Sf, u~ meet that deadline. It should be taken into account however that the purpose <br />~ for the required analysis was to determine suitability of soil materials far <br />reclamation. As the reclamation of McClane Canyon was identified as being <br />scheduled for the year 2011, one should reflect on the importance of missing <br />the stipulated date by 5 months. <br />Salt Creek has not finalized a configuration of the McClane Canyon work area, <br />and has no present plans to do so. It is requested that this stipulation <br />y be dropped as Salt Creek will be incorporating such plans with the application <br />Std ~~ for the second permit term. It is anticipated that the configuration approved <br />by the Division will exist through this permit term. Any configuration, other <br />than that existing, will be submitted to the Division for approval prior to <br />construction. <br />~~ <br />