My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46918
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:24 PM
Creation date
11/23/2007 2:59:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
General Documents
Doc Name
RECORD OF DECISION WOLF RIDGE CORP MINE PLAN FOR A NAHCOLITE SOLUTION MINE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Well spacing bet~'ween cavities shall be adequate to ensure a 20-foot width <br />at the top of the pillars that separate the cavities. <br />4. Diverter lines for the blow out preventec shall be directed into a lined <br />mud pit at least 125 feet Erom the well. <br />5. Adequate waiting--on-cement times shall be observed for all cementing <br />operations to achieve a minimum of 500 pounds per square inch (psi) <br />compressive strength. <br />6. Drilling fluid ms~terial will be contained in bentonite lined mud pits and <br />hauled to evaporation ponds upon completion of drill holes, unless <br />otherwise approved in writing by the authorized officer. <br />7. A yearly plan of development and summary of the activity for the previous <br />year shall be submitted prior to initiation of project development and by <br />February 1 of each year thereafter. The plan will include the following <br />items: <br />A. Summary of the activity for the previous year including, but not <br />Limited to, <br />1. Any new findings oc developments, <br />2. Acres disturbed, acres reclaimed, <br />3. Wells drilled, plugged, converted to monitoring, etc., <br />4. Hydrologic monitoring. <br />B. Proposed operations for the coming year, including, but not limited <br />to, <br />1. Location and number of new wells to be drilled, <br />2. Well field piping system layout, including location of pressure <br />transducers, 6-inch drain line connection points, and valves. <br />3. Number ot: acres to be disturbed and to be reclaimed. <br />C. Status of all. surface facilities and wells not abandoned. <br />D. Any technical. considerations and/or proposed changes in approved <br />operations. <br />E. Hap of mined-out cavities and identification of any subsidence areas. <br />Prior approval is necessary for any change made to informational submittals, <br />monitoring, or approved operations. <br />HONITORING <br />1. Weekly monitoring of the mud gel in the annulus between the 13 3!6-inch <br />surface casing and 8 S/8-inch well casing will be required and any <br />observed changes and/or any remedial measures taken shall be reported <br />monthly to the authorized officer. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.