Laserfiche WebLink
<br />-3- <br />Stipulation IVo. 5 ~ <br /> <br />U.S. STEEL SHALL SUBMIT A DEMONSTRATION THAT 7HE PROPOSED <br />S POST-MINING CONTOURS OF ALL AREAS FUR WHICH THEY HAVE APPLIED <br />FOR A VARIANCE FROM THE APPROXIMATE ORIGINAL CONTOUR RESTUkAT1UIJ <br />REQUIREMENTS, WILL BE STABLE WITH A STATIC FACTOk OF SAFETY OF <br />1.3 WITHIIV 12U DAYS AFTER PERMIT ISSUANCE. <br />Stipulation No. 6 <br />U.S. STEEL SHALL SUBMIT A STUUY OF NOISE LEVELS, NOISE SOURCES, <br />ANU METHODS {if any) 7HAT COULD BE USED TO MITIGATE WOISE <br />IMPACTS (if any) AT THE PROPOSED SOt•1ERSET VENTILATION FAtJ ALOIVG <br />(o HUBBARU CREEK PRIOR TO THE CONSTRUCTION OF THE FACILITY. THE <br />STUDY SHALL BE CONDUCTED IN CONSULTATION WITH THE USFS, OSM, ANU <br />THE DIVISION. U.S. STEEL SHALL IMPLEI.IENT NOISE ABATEMENT <br />MEASURES (if practical) THAT ARE RECOh1MENUEU IN THE STUUY AIJU IN <br />CONSULTATION WITH THE U.S.F.S., O.S.h1., AND THE DIVISION WITHIN <br />9U DAYS AFTER COMPLETION OF THE FAN FACILITY. <br />