Laserfiche WebLink
Rclcr lu :\ppcndix :~ fur l'O I)~Il;, Park ('~~unty and Tetlcr C~~unt} m:+nr.,ertcnt rrquircments. <br />X1.3 Proposed Action / Purpnse and \eed <br />I'roposcd :fiction: <br />I he operator submitted proposed Plans of Oprratiu:ts fur t_iiacier l'cak, Crystal Jack and Colorado ('alumet <br />mining operations in Ochther ?005. June't,t,5 and January ?~ ~(tb, respcetivcl}•. r\n addendum o(the Cilacicr <br />Peak proposed Plan of Operations was received in \ovember of 2005, w bleb included a proposed access <br />road to allow mechanical eywpment +nto the nurthernnwst Taints. <br />'fhe operator plans to explore proposed dig sites I'or geologic deposits that may produce crystals and <br />associated specimens including amazonite, smoky quartz, Ouorite, guethite, hematite, albitc, macanitc and <br />microclinc. In addition, the operator proposes the following: <br />Glacier Pcak: <br />- o Opcn three small prospccnng dig sacs totaling Icss than 1600 syuarc feel in a given year. Prospect+ng <br />dig sites arc typically short-temt dig sites, nuaning that reclamation would occur,cithin tltrcc weeks if <br />miner:dization is not evident. <br />o Open up to two excavation Sig sites limited to Icss than one-third acre disturbance prr year. <br />o L.intit total disturbance ti)r both prospecting and excavation die sites to 0.3G acres per year with a <br />maximum depth of 30 feet. <br />_ Construct a temporary aeress roast in order to hr.ne mechanic,'. equipment to the northernmost claims. <br />Reopen a closed road in order to bring mechanical cyutpntent to the fake five cl:+im. <br />'~1` ~.. ..1 Jack: <br />t 4~rn three small prospecting dig sites totaling less th:ut 1600 square feet in a given year. Open up to I,vu <br />~. •.c:tcanon dtg sacs limited to Icss than one-third acre dtsavbanee per ye;v. <br />I .snit total disturbance tiv both prospecting and cxcavatiun dig sites to 0.3G acres per year with a <br />n;axinnnn depth of 311 feet. <br />~ nlorado C:+luntcc <br />Open small prospecting dig sites and an average of ?.5 exrtc:uiun dig sites per year. <br />i unit wt:d disturh;+ncc for both prospecting and cxcavatiun dig sites w 0.', 5 acres per year with a <br />~a.+xinmm depth of 30 feet. <br />!'!::.::r refer to'fahle I.I for a description of the maximum number and size ofpmposed dig sites for each <br />~ctatiort acct a Irn year period. <br /> <br />Pace 2 of.19 <br />