My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46521
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:20:20 PM
Creation date
11/23/2007 2:42:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
4/10/2000
Doc Name
RECORD OF DECISION NORTH FORK COAL ELK CREEK COAL LEASE TRACT COC 61357
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 2000 Record of Decision Page 19 <br />in the Terror Creek drainage to facilitate flexibility in locating entries beneath Terror Creek for <br />access to coal in the Bowie No. 1 "pod". Additional surface area and reserves that are located <br />between the Iron Point and Elk Creek Coal Lease tracts were added to the Elk Creek tract. In <br />Alternative C, mining would be completed by longwall techniques, and coal production would be <br />the same as outlined in Alternative B. Recoverable coal reserves in the Elk Creek tract are <br />estimated to be 23 million tons in the D seam. The B seam in the Elk Creek coal lease tract <br />has either been previously mined or is nonexistent. Recoverable coal reserves in the in the Iron <br />Point tract are estimated to be 41 million tons in the D and B seam. <br />Alternative D -Subsidence Protection <br />This alternative would be essentially the same as Alternative C, with the limitation that there <br />would be no subsidence under Terror or Hubbard creeks, or the Curecanti-Rifle 230/345 kV <br />electric transmission line. For the Elk Creek Coal Lease Tract, there are approximately 2 <br />million tons of coal less than in Alternative C. <br />Based on continuing geologic analysis for the area and since the issuance of the Draft EIS, the <br />boundaries of the proposed Iron Point Coal Lease Tract have been modified. It appears that <br />the B and D coal seams thin and split into seams of unmineable thickness toward the northwest <br />part of the tract. The re-alignment of the boundary provides additional subsidence protection to <br />Terror Creek Ditch and Reservoir. In addition, the continuing analysis indicates that the <br />igneous intrusions may have "burned" portions of the B and D coal seams, leaving no mineable <br />coal. Based on this re-evaluation of the lease tract, there are approximately 5 million tons of <br />coal less in Alternative D than originally estimated for the Iron Point Coal Lease Tract in the <br />Draft EIS. Minor additions of surface area were added in the southeast corner to help facilitate <br />a safer mine plan. <br />Forest Service -Elk Creek Coal Lease Tracf <br />
The URL can be used to link to this page
Your browser does not support the video tag.