Laserfiche WebLink
L <br />Stioulation No. 48 <br />COVCC will submit and obtain approval of additional bond, required for reclamation of <br />the rock slope tunnels, before beginning construction of these tunnels. The required <br />bond amount is identified in tasks 19 and 85c of the Division's January 10, 1994 bond <br />estimate for Orchard Valley Mine. Bond for these tasks are currently deferred. <br />Permittee <br />3 i~~ 9`1 <br />Da e <br />Please sign and date both copies and return one copy to the Division, signifying COVCC's <br />acceptance of Stipulation No. 48. <br />