Laserfiche WebLink
Robillcard <br />& Associotes, <br />• <br />Inc. <br />• ~~.. <br />1C f <br />1I (,yc", L <br />(.~OI~SI 111111, ~Il(~If'IC~'[S ~_CII a . :_;I 11~i`,`,/' )I .': I(_:i II C"'f <br />COr151r~ ~C11r~n f~iliUl-IGCJL'~S <br />September 21, 1982 <br />Mr. Scott Patten, Vice President <br />Flatiron Companies <br />P, 0. Box 229 <br />Boulder, CO 80306 <br />Walden Coal <br />Our Project No.: 82-01$-O1 <br />Dear Scott: <br />We have continued to make periodic on site inspections of the land <br />reclamation for the Walden Coal Company project. The last inspection <br />being September 10, 1982, <br />We note that the 8150 contour is in place. We find that the project is <br />continuing as per acceptable standards with adequate compaction in the <br />overburden placement. The owner has about finished topsoil stripping <br />for this year with a small amount remaining to be done next spring. The <br />remaining stripping will be in the northwest area of the dump. <br />Very truly yours, <br />ROBILLARD & ASSOCIATES, INC. <br />~~,- ~~ 1 <br />Norman L. Ringhand, P. E, <br />Manager of Engineering <br />NLR/ae/jh <br />P O Box 2117 Second Flr~or Phone 303 d68 62r <br />Dlllon,Colr~rodofi0435 Sno"~ Bank Bldg D.,rn~erCi;rar 1303-623-Od: <br />?~f.l iill;l'~ P,rir l <br />