My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46505
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:20:19 PM
Creation date
11/23/2007 2:41:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
7/2/1982
Doc Name
OSM Permit No. CO-0043
From
OSM
To
NATIONAL KING COAL INC
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. -; ; <br />mit I:umber CO-0043 <br />age 5 of 5 <br />Attachment 1 <br />Special Stipulations <br />The term "regulatory authority" means the Colorado 2lined Land Reclamation Di- <br />vision (CL'1RD) and the Department of the Interior, OSM. <br />1. \ational King Coal Inc. must monitor w,ster levels and water quality in <br />the alluvial aquifer of Hay Gulch on a quarterly basis. The e:isting <br />monitoring well ui11 be adequate for these purposes once the following <br />items are satisfied. <br />A. The top of the uell must be sealed to prevent surface water and <br />other debris from entering the well casing. <br />B. Monitoring should only occur on Ffonday mornings, after the well has <br />set idle for an entire weekend. National King Coal Inc. must moni- <br />tor for the following water quality parameters: <br />pH <br />Conductivity <br />Temperature <br />Total Dissolved Solids <br />Calcium <br />tfagnesium <br />Sulfate <br />Iron <br />Manganese <br />C. Tile results of this water level and water quality monitoring shall <br />be submitted to the regulatory authority on a quarterly basis. <br />2. National Icing Coal Inc. must prepare a mass balance plan to clarify the <br />indicated sources of material to be used to backfill and regrade the sur- <br />face facilities area. Such plan shall include an amended description of <br />material sources and techniques of material placement to be utilized. <br />Volume calculations shall be completed detailing the volume of fill re- <br />quired and the volume of material to be obtained from each source, such <br />as salvage of existing benches, deposition of underground development <br />waste and roof fall, deposition of sediment from sediment ponds and the <br />disposal of demolished surface facility debris. This mass balance e:tpla- <br />nation shall be submitted to the regulatory authority within 60 days fol- <br />lowing the issuance of the approved permit. <br />Further, tational King Coal Inc. must prepare an appropriate geotechnical <br />and stability analysis of the proposed backfilled configurations for the <br />portal bench areas at the :Cing Coal `tine. These analyses shall utilize <br />accepted slope stability mathematical analysis techniques, material <br />strength determinations and appropriately detailed geotechnical knowledge <br />of the site, in order to complete tl~e required stability demonstration. <br />A report of this required stability analysis and the appropriate geotec?i- <br />nical investigations or ether information acceptable to the regulatory <br />authority dem~~nstrating stability, shall be submitted to the regulatory <br />authority for approval within 120 days following issuance of the approved <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.