Laserfiche WebLink
<br />STIPULATION NC. 18 <br />ENERGY FUELS MINING COMPANY WILL COMPLETE A SURVEY DESCRIBING THE <br />POTENTIAL EFFECT ON THE STRUCTURE (AMENDED COAL PROCESSING WASTE PILE) <br />FROM SUBSIDENCE OF THE SUBSURFACE STRATA RESULTING FROM PAST UNDERGROUND <br />MINING ACTIVITIES AS REQUIRED BY RULE 2.05.3(8)(a)(i)(D). ENERGY FUELS <br />MINING COMPANY SHALL SUBMIT THAT SURVEY, FOR REVIEW BY THE DIVISION, NO <br />LATER THAN ONE YEAR FOLLOWING RETURN OF THE MINE TO ACtIVE MINING <br />STATUS. THE OPERATOR SHALL RESTRICT PLACEMENT OF COAL PROCESSING HASTE <br />TO THAT AREA DELINEATED ON THE MAP SUBMITTED AS A SUPPLEMENTAL AMENDMENT <br />TO THE TECHNICAL REVISION APPLICATION, UNTIL THE DIVISION HAS APPROVED <br />THE SUBSIDENCE SURVEY. IN THE EVENT THAT THE REQUIRED SUBSIDENCE SURVEY <br />WERE TO DETERMINE THAT THE PROPOSED AMENDED COAL PROCESSING WASTE PILE <br />MIGHT POTENTIALLY BE DAMAGED BY ANTICIPATED SURFACE SUBSIDENCE, ENERGY <br />FUELS MINING COMPANY SHALL REDESIGN THE PROPOSED AMENDED EMBANKMENT TO <br />RENDER THE DESIGN ACCEPTABLE TO THE DIVISION. <br />STIPULATION N0. 20 <br />WITHIN 60 DAYS OF APPROVAL OF THE APPLICATION TO RENEW THE ANIMAS MINE <br />PERMIT, ENERGY FUELS MINING COMPANY WILL IDENTIFY ALL ROADS TO BE USED <br />WITHIN THE PERMIT AREA, ASSIGN ACCEPTABLE DESIGNATIONS OF USE FOR THESE <br />ROADS, PROVIDE ACCEPTABLE DESIGN AND CONSTRUCTION PARAMETERS FOR ALL <br />ROADS CONSISTENT WITH THEIR DESIGNATIONS OF USE, AND SUBMIT MAPS <br />ILLUSTRATING THE LOCATIONS OF THESE ROADS AND THEIR DESIGNATIONS OF USE <br />FOR ALL COPIES OF THE PERMIT APPLICATION IN THE DIVISION'S POSSESSION <br />AND AVAILABLE TO THE PUBLIC. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />B A-,+,.w 1 ~e.e., G~d~ <br />Operato~ ~ ~ t e <br />Di vi, on D Q r' <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />