Laserfiche WebLink
Marr Strip Stipulation Summary <br />February 11, 1989 <br />There are five remaining stipulations on the Marr Strip permit. Two <br />stipulations concern monitoring requirements: Stipulation 2 addresses aerial <br />volumetric surveying and Stipulation R1 addresses the submittal of an annual <br />Hydrology Report. The requirements of these stipulations have been met to <br />date. Stipulations 1 and 3 are stipulations based on future expansion or <br />modification of operations at Marr. The Division has extended the deadline <br />for submittal of information related to Stipulation R2 until Kerr submits a <br />new mine plan, per correspondence from Michael Savage to David Gossett on <br />April 22, 1988. <br />