My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46467
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:20:17 PM
Creation date
11/23/2007 2:40:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
3/16/1989
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />Legal, Financial and Compliance Information - Rules 2.03, 2.07.6(2)(f), <br />. g an <br />Please submit updated maps which show the current permit area CRule <br />2.10.1(3)]. <br />Bonding - Rule 2.05.4(2)(b) <br />It is not clear whether the final bond includes costs for reclamation of <br />Pond G. If not, please propose bond for this existing structure, the <br />adjacent light use road and the haul road extension. <br />Geology Rules 2.04.5 and 2.04.6 <br />Overburden analyses suggest that high sodium concentrations are found in <br />a significant number of samples throughout the stratum. The Division is <br />not confident that the mixing provided by truck and scraper operations is <br />adequate to protect the plant growth medium. Therefore, the Division <br />requests that Kerr propose a sampling plan which ensures that a four foot <br />layer of non-toxic material covers the area. Kerr may choose to identify <br />sodic layers in the overburden and handle them separately. Another <br />alternative would be to sample the final graded backfill prior to topsoil <br />replacement. The sampling plan should commit to a specific sampling <br />spacing and compositing interval [4.14.3(1)(b)]. <br />Hydrologic Balance - Rules 2.04, 2.05 and 4.05 <br />Table 62A and Maps 15A and 17A do not correspond completely. Please <br />identify the location of 028-77-14, 028-79-26, 028-79-61, 028-AI- and <br />028-AI-. Please indicate the casing elevation and total depth of KlJ-land <br />KW-3. <br />Were alluvial wells ever drilled along the Canadian River or along Bolton <br />Draw per the discussion on page 780-108? If so, please modify table 62A <br />and Map 15A. If not, please discuss the discrepancy between your plan <br />and current conditions. <br />Please prepare a table addressing the completion characteristics of wells <br />in the current and proposed monitoring plan. Identify the casing <br />elevation, the total depth, the location of perforated casing, the casing <br />diameter and the casing composition. This information will be used to <br />assess the integrity of the wells in the zones of interest and to ensure <br />that mixing of disjunct aquifers is not occurring within the wells. <br />
The URL can be used to link to this page
Your browser does not support the video tag.