Laserfiche WebLink
Page 13 <br />Construction Materials Rule 1 <br />(f) the Applicant's signature. <br />(6) In addition to submitting an appropriately completed Permit <br />application form, the Operator shall submit any Exhibits specified in Section <br />6.1 for the appropriate type of operation. <br />u5(z] (7) In the case of any complex Permit applications, serious <br />unforeseen circumstances or significant snow cover on the affected land that <br />prevents a necessary on-site inspection, the decision date established by the <br />Office maybe extended up to sixty.(60) days beyond the usual maximum limit <br />for an operation of that particular type and size. The Office shall notify, as <br />soon as possible, the .Applicant and any persons commenting on the <br />application, of a finding that an application is complex and of the new decision <br />date. <br />za-a-tos(~> (8) The Applicant shall follow the appropriate Notice Procedures, <br />according to permit type, as outlined in Section 1.6. <br />(9) A condition or limitation to the application, unless consented <br />to by the Applicant, shall be treated.as a denial. <br />t io 1.4.2 Specific Requirements for Limited Impact 110 Permit Applications <br />(see Figure 1) - <br />1t6(al (1) All general application requirements outlined in Subsection <br />1.4.1, shall be required for Limited Impact 110 Operations. <br />(2) An application will be considered filed for the purpose of . <br />calculating the thirty day decision-making time period under Section 34-32.5- <br />110(4), C.R.S., as amended, when the application file includes all of the <br />following submittals: <br />(a) "I`he application fee, as determined under Section 34- <br />32.5-125, C.R.S.; as amended;. <br />(b) One (1) original and two (2) copies of: <br />