Laserfiche WebLink
.. <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1 313 Sherman St.. Room 215 <br />Uenve~, CO 80203 <br />Phone: (3031 R66-35b7 <br />FA%: (3031 63 2-6106 <br />R~cEi~~En <br />MINING PERMIT - COAL <br />APR 12 1993 <br />Permit Date: December 31, 1992 <br />Division of (~niiieiais 6 Gzoicgy <br />Permit No.: C-81-O10 <br />Permit Expiration Date: December 31, 1997 <br />' p--F~~Cp~~~ <br />,c~4/QdK.R~ <br />.A~ <br />• ~ <br />~ /8'16 <br />Roy Rumer <br />Guvernor <br />Michael B. Lang <br />Diviwon Dueaor <br />THIS PERMIT is issued by the Division of Minerals and Geology, Department of <br />Natural Resources, State of Colorado. <br />RECITALS <br />I. Trapper Mining Inc. ("operator") desires to conduct a mining operation <br />known as Trapper Mine for the purpose of extracting coal. <br />II. On January 19, 1993, the Division of Minerals and Geology ("the <br />Division") approved the operator's application for this permit, fixed the <br />amount of bond and directed that this permit be issued upon the filing with <br />the Division of bond in the amount so fixed in form and substance approved by <br />the Division, and such bond has been so furnished. <br />III. On January 19, 1993, the Division made the following findings: <br />(a) The permit application is accurate and contains all information <br />required under C.R.S., 34-33-101 et sec. and regulations promulgated <br />thereunder and that all the requirements of Article 33 of Title 34, C.R.S. <br />("such article") for the issue of a permit have been complied with; <br />(b) The applicant has demonstrated that reclamation as required by such <br />article can be accomplished under the reclamation plan contained in the permit <br />application; <br />(c) The assessment of the probable cumulative impact of all anticipated <br />mining in the area on the hydrologic balance specified in Section <br />34-33-110(2)(1) has been made by the Division and the proposed operation <br />thereof has been designed to prevent material damage to the hydrologic balance <br />outside the permit area; <br />(d> Granting the permit will not conflict with any designation decision <br />issued pursuant to Section 522 of the Federal "Surface Mining Control and <br />