Laserfiche WebLink
a <br />~r <br />Golder <br />-Associates <br />October 1, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Uluon Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.; 043-2170 <br />RE: Summary No. 20: September 19 through September 25, 2004 <br />Cresson Project Phase IVc Construcfion Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this sununary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of September 19 <br />through September 25, 2004. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 29° F to 48° F, and highs ranged from 47° F to 66° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construcrion Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction activities on seven days of this seven-day <br />reporting period (September 19 through September 25, 2004). <br />Phase IVc <br />Ames completed construction of approximately 100 feet of LDT trench extension and installed the two <br />eastem LDT sumps during this reporting period. <br />Ames continued production of Drain Cover Fill (DCF) material at the screen plant by the secondary <br />crusher. <br />Ames continued hauling, placement and grading of DCF material into the Phase IVc OSA in the eastern <br />section of the VLF, Raven Hill azea. Ames placed DCF material and High Volume Solution Collection <br />(HVSC) piping per the project plans onto approved geomembrane panels. <br />Phase IVc 20 September 19-September 25, 2004 043-2170 <br />