Laserfiche WebLink
<br />5) The approved mine plan page 3, Exhibit E - Reclamation Plan stai:es that <br />"Where. ample overburden is available highwalls will be eliminated." <br />Holnam should provide the Division with a map showing where the highwalls <br />will be eliminated and where they will not. Where they will not: a plan <br />must be provided describing what slopes they will be reclaimed to, the <br />methods to be used, and the volumes of material required. Across <br />section of these area is also necessary in order to calculate the bond. <br />6) It is not possible to calculate financial warranty costs from the current <br />maps, the Division must be provided with maps and supplementary <br />information for each area, which shows the volume of material to be used <br />during final grading, the source of the fill material and the average <br />transport distance for the material. <br />If you have additional questions or concerns, please call. <br />Sincerely, <br />Berhaele~ w <br />Reclamation Specialist <br />BK/srm <br />3764E <br />