Laserfiche WebLink
C-81-019 2005 Midterm Review <br />May 5, 2005 <br />Rule 4.05.13(1)~) ...................................................................................................................... ..20 <br />Item 55 ................................................. 20 <br />Rule 4.05.13(4)(a) ...................................................................................................................... ..20 <br />Item 56 ................................................. 20 <br />Rule 4.05.13(1)(e) ...................................................................................................................... ..20 <br />Item 57 ................................................. 20 <br />Rule 4.05.13(4)(c) ...................................................................................................................... ..20 <br />Item 58 ................................................. 20 <br />Rule 4.06.1(2) ................................................. <br />... <br />........................................................................ ..21 <br />_ <br />_ <br />- --Item 59 ................................................. 21 <br />Rule 4.07.3 and Rule 4.13 .......................................................................................................... ..21 <br />Item 60 ................................................. 21 <br />Item 61 ................................................. 21 <br />Rule 4.11.4(2) ............................................................................................................................ ..21 <br />Item 62 ................................................. 21 <br />Item 63 ................................................. 21 <br />Item 64 ................................................. 21 <br />Rule 4.18 ..................................................................................................................................... .21 <br />Item 65 ................................................. 21 <br />Section VI - Bondine Summarv ................................................................................................ ..21 <br />Introduction <br />The Division of Minerals and Geology (Division) conducted this review in compliance with Rule <br />2.08.3(1) of the Colorado Surface Coal Mining Reclamation Act and the Regulations of the <br />Colorado Mined Land Reclamation Boazd for Coal Mining (Rules). Rule 2.08.3(1) requires a <br />review of each permit issued and outstanding not later than the middle of the term of the permit. <br />This review is of the Colowyo Coal Mine Permit C-81-019 of November 5, 2002 (the fourth <br />renewal of this permit) and the associated Permit Application Package. The Permit and the <br />Permit Application Package are collectively referred to as the PAP in this document. Previous <br />permits, findings, reviews, files of the Division, and reports were reseazched as were appropriate <br />to this review. Section V of this review contains a determination of compliance of the PAP with <br />selected rules, as well as a list of suggested (in terms of requests of the applicant) and required <br />revisions to the PAP. The Rules contain the complete text of rules referenced throughout this <br />document. <br />The Colowyo Coal Mine, a surface mine, is located in Moffat and Rio Blanco Counties, <br />Colorado, approximately 28 miles southwest of Craig, Colorado. The permit azea is (with very <br />minor exceptions) west of, and contiguous on the east side with, Colorado State Highway 13. <br />The permit encompasses 7,531.05 acres (515.79 Federal, 640 State, and 6,375.26 private surface <br />acres; 5,573.79 Federal, 650.21 State, and 1,307.05 private coal acres). There has been no change <br />in these acreages since the last renewal of the Permit. The permitted azea of disturbance is 3831.4 <br />acres (3,979 at Permit Renewal 4). The Colowyo Coal Mine is composed of three open pits. <br />Multiple-seam mining operations aze currently conducted in the West Pit and high-wall mining <br />operations are currently conducted in the East and West Pits. There aze no current mining <br />operations in the Section 16 open pit. Coal is shipped by rail (although trucking is an option) <br />from a coal loadout facility within the permit azea. <br />4 <br />