Laserfiche WebLink
JUN-13-2000 13 12 DELRtJEY 8 DELRNEY 970 945 2303 P.07 <br />• • <br />Steve Bennett <br />June 13. 2000 <br />Page 6 <br />The reclamation process was intended to be carried out over <br />a period of four to five years during which "the results will be <br />monitored ... (Reclamation Plan, page 5, 1989 amendment). The <br />designated postmining land use is "wildlife habitat" and "Success <br />of the reclamation program will be assured when the reclaimed <br />areas provide as good winter range for deer and elk as the •~. <br />immediatz surroundings area, and the adverse scenic impact of the <br />mining operation is minimized by the revegetation program. <br />Additional disturbance by further extraction was simply never <br />contemplated. <br />Ir. summary: the <br />reclamation. <br />We look forward <br />Springs. The meeting <br />issues and I am sure <br />community pit is inconsistent with <br />MEETING OF JUNE 14 <br />to meeting with you on May 14 in Glenwood <br />3 will offer the opportunity to discuss these <br />it will be a constructive discussion. <br />Sincerely, <br />PITKIN IRON CORPORATION <br />gy ~~?v~w~.-nom L~9-~` <br />Diane Delaney • <br />DD/pc <br />Encl. <br />xc: Greg Squire without encl. <br />Cheryl Linden without encl. <br /> <br />roraL P.e7 <br />