Laserfiche WebLink
-15- <br />VII. Water Rights and Replacement - Rules 2.04.7(3). <br />2.05.6(3)(a)(ii) and 4.05.15 <br />A. Loadout Site <br />Snowmass Coal Company has secured four water rights at the Loadout for <br />use by the operation. Water is used by the operator for dust <br />suppression, plant washdown, <br />water rights are junior (havi <br />augmentation is in place in t <br />be placed on the operation. <br />Volume I, Section 4.6.1.3.6, <br />found 1n Volume III, Appendix <br />Mine Site <br />sanitation, and irrigation. <br />ng been recently issued), a <br />he event senior water users <br />The water rights discussion <br />with court decrees and augm~ <br />3-T of the application. <br />Although these <br />plan of <br />require a "call" <br />can be found in <br />~ntation plans <br />The mine consumes water for irrigation, dust suppression, domestic uses, <br />and coal preparation plant operations. The source of this water comes <br />from mine inflows. Snowmass has secured two absolute water rights for <br />the water pumped from the mine. A discussion of water use and rights is <br />contained in Volume I, Section 4.6.1.3.6 of the application. <br />The review of the water rights sections was conducted with the assistance <br />of the Colorado State Engineer's Office, Division of Water Resources. <br />The mine and Loadout were found to be in compliance with the requirements <br />of this section. <br />VIII. Probable Hydrologic Consequences of Mining and Cumulative <br />Hydrologic Impacts Study - Rules 2.05.6(3) and 2.07.6(2)(c) <br />This Cumulative Hydrologic Impact Study (CRIB) for the drainage basin of <br />the Roaring fork River has been prepared by the Colorado Mined Land <br />Reclamation Division (CMLRD) pursuant to Rule 2.07.6(2)(c). This CHIS <br />assesses the probable cumulative hydrologic impacts of all anticipated <br />coal mining operations upon the general area of the Roaring Fork River <br />Valley (figure 2). Included in this assessment are existing coal mines <br />and those proposed coal mines for which permit applications have been <br />submitted to the Division. This study has been prepared using <br />information and analysis contained in the Coal Basin mines permit <br />application, information and analysis contained in other permit <br />applications of mines located in the general area and other available <br />information, including site visitation by members of the Division staff. <br />Coal mining operations in the study area include: <br />1. Garfield Energy Corp. - Sunlight Mine, CMLRD File No. C-046-81 <br />2. Snowmass Coal Company - North Thompson Creek Mines, CMLRD File <br />No. C-025-81 <br />3. Mid-Continent Resources, Inc. - Coal Basin Mines, CMLRD File <br />No. C-017-81 <br />