Laserfiche WebLink
r r. <br />III IIIIIIIIIIIIIIII STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />FROM: Christine E. Johnston <br />RE: Status of Stipulations <br />The following is the list of stipulations for the Red Canyon Mine. <br />Stipulation Nos. 1-9 were added during the first permit issuance. Stipulation <br />No. 10 was added during the 1988 permit renewal, and Stipulation No. 11 was <br />added during the 1993 permit renewal onlyStipulation Nos. 6 and 11 are active. <br />List of Stipulations <br />Depa«mem of Natural Resources ~~oF'oo~R <br />H' <br />1 31 3 Sherman SL, Room 21 5 <br />Denver, CO 80103 ~.~~~ <br />Phone: 13031 866-}567 ' ~e~c ,' <br />FAX: X3031 872-8106 <br />Roy Romer <br />DATE: June 15, 1993 c°"efnOf <br />Michael B. Lung <br />Divi,iun DueUOr <br />T0: Stipulation Tracking File, d Canyon Mine; File No. C-81-034 <br />Stipulation No. 1 <br />WITHIN 30 DAYS OF ISSUANCE OF THE PROPOSED DECISION, THE PERMITTEE WILL <br />SUBMIT POND SIZING CALCULATIONS FOR INCORPORATION INTO THE PERMIT <br />APPLICATION. STORAGE CAPACITY FOR SEDIMENT AND WATER PUMPED FROM THE <br />MINE MUST BE ADDRESSED. IF THE POND IS DETERMINED TO BE NOT IN <br />COMPLIANCE WITH THE REGULATIONS, IT WILL BE UPGRADED AS NECESSARY WITHIN <br />3 MONTHS OF PERMIT ISSUANCE, AND PRIOR TO RESUMPTION OF ACTIVE MINING <br />STATUS AT RED CANYON. <br />STATUS: Complied with October 11, 1984. <br />Stipulation No. 2 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A REVISED <br />STREAM CHANNEL RECONSTRUCTION PLAN TO THE DIVISION FOR REVIEW. IN <br />ADDITION TO THE INFORMATION PREVIOUSLY SUBMITTED, THE STREAM CHANNEL <br />RECONSTRUCTION PLAN SHALL IDENTIFY THE WIDTH OF THE NATURAL STREAM <br />CHANNEL DOWNSTREAM OF THE DISTURBANCE, THE MAXIMUM WIDTH OF THE <br />RECONSTRUCTED CHANNEL, THE DEPTH OF THE RECONSTRUCTED CHANNEL, AND THE <br />NATURE OF THE BED AND BANK MATERIAL TO BE USED FOR CHANNEL <br />RECONSTRUCTION. THE APPLICANT SHOULD PROVIDE CALCULATIONS FOR THE DESIGN <br />EVENT AND FOR FLOW VELOCITIES IN BOTH THE 5 FT. WIDE AND 10 FT. WIDE <br />CHANNEL SEGMENTS. THE APPLICANT WILL IDENTIFY STREAM SEGMENTS WHERE <br />RIPRAP OR OTHER EROSION PROTECTION WILL BE USED. A STREAM PROFILE SHOULD <br />BE SUBMITTED THROUGH THE ENTIRE LENGTH OF THE AREA PROPOSED FOR <br />RECONSTRUCTION SHOWING THE ORIGINAL SLOPE AND THE PROPOSED RECONSTRUCTED <br />SLOPE. <br />IF RIPRAP IS USED, THE PLAN WILL INCLUDE A DISCUSSION CONCERNING THE <br />SIZING, GRADATION, AND PLACEMENT OF RIPRAP. IN ADDITION, IT WILL DISCUSS <br />HOW THE DURABILITY OF THE MATERIAL USED FOR RIPRAP WILL BE DETERMINED. <br />STATUS: Complied with August 21, 1984. <br />