Laserfiche WebLink
THREE (3)X RELATIVE COVER OR MORE THAN 407. RELATIVE COVER. COVER TO BE <br />DETERMINED BY MEASUREMENTS MADE FROM VEGETATIVE COVER DATA ASSEMBLED <br />DURING SAMPLING FOR MONITORING OR REVEGETATION SUCCESS DETERMINATION. <br />Stipulation No. 21 <br />IN ORDER TO MONITOR THE VOLUME OF COAL MINE WASTE MATERIAL DISPOSED OF IN <br />THE APPROVED PILE, THE STRUCTURE WILL BE SURVEYED BY A QUALIFIED <br />REGISTERED ENGINEER DURING EACH QUARTERLY SITE INSPECTION REQUIRED BY <br />RULE 4.10.2. THE PERMITTEE WILL SUBMIT A COMPLETE PERMIT REVISION <br />APPLICATION ADDRESSING ALTERNATIVE COAL MINE WASTE DISPOSAL PLANS BEFORE <br />THE VOLUME OF MATERIAL IN THE APPROVED PILE EXCEEDS 10,000 CUBIC YARDS. <br />IF NO ALTERNATIVE WASTE DISPOSAL PLAN IS APPROVED, MINING OPERATIONS WILL <br />CEASE WHEN THE APPROVED DISPOSAL PILE VOLUME REACHES 15,000 CUBIC YARDS, <br />AND THE PERMITTEE WILL INITIATE AND COMPLETE RECLAMATION OF THE ENTIRE <br />MINE SITE WITHIN SIX MONTHS OF THE CESSATION OF MINING. <br />Stipulation No. 23 <br />WOODY PLANT DENSITY IN THE RECLAIMED SAGEBRUSH COMMUNITY SHALL BE DEEMED <br />SUCCESSFUL IF 1000 LIVE STEMS PER ACRE OF WOODY PLANTS ARE ESTABLISHED. <br />Stipulation No. 24 <br />PRIOR TO THE INITIATION OF CONSTRUCTION OF SURFACE FACILITIES WHICH ARE <br />NOT ON SITE AS OF NOVEMBER 17, 1992, THE PERMITTEE WILL SUBMIT BOND IN <br />THE AMOUNT OF $132,959.00. THIS BOND MUST BE RECEIVED AND APPROVED BY <br />THE DIVISION PRIOR TO THE INITIATION OF CONSTRUCTION OF ADDITIONAL <br />FACILITIES. <br />Stipulations 3, 16, 19 and 21 from the previous prmit are retained on this <br />renewed permit. Stipulation No. 4 from a previous permit is being replaced <br />with this renewal since the permit application no longer contains a commitment <br />regarding water rights in the Vulcan Ditch. Stipulation No. 23 is being added <br />to the renewed permit since the previous commitment to a woody plant success <br />standard was omitted from the permit application. Stipulation No. 24 is being <br />added to the renewed permit and Stipulation No. 22 is being merged with <br />Stipulation No. 24. <br />-3- <br />