Laserfiche WebLink
<br />Stipulation No. 21 <br />STIPULATION TO TECHNICAL REVISION 05 - THE OPERATOR WILL MONITOR THE <br />DIVERSION DITCH ABOVE THE RIENAU N0. 2 MINE SEMI-ANNUALLY, AND ANNUALLY <br />REPORT TO THE DIVISION THE PERFORMANCE OF THE DITCH. THIS MONITORING <br />WILL CONTINUE THROUGHOUT THE RECLAMATION BONDING PERIOD. IF <br />INSTABILITY IS EVIDENCED PRIOR TO EXPIRATION OF THE BONDING PERIOD, THE <br />OPERATOR MAY BE REQUIRED TO RECLAIM THE DITCH IN ACCORDANCE WITH THE <br />ORIGINAL APPROVAL RECLAMATION PLAN. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />e~-e (,~•.u~., ~ <br />By v. P. <br />e a 9~ /I ,-. / it e <br />on <br />AG Alpha No. NR LR TYB <br />AG File No, PNR/3928/JD <br />8697G <br />