Laserfiche WebLink
r:.rE Or ~,~i „~. .:roc ~: ~, ~, ..~:., ., ~_. ,,.. III IIIIII III IIIIIII <br />U CPANTMENI OF NST ORAL RFSOURCCS <br />D. P;IOnic Pasco c. Exec~uen D~•~r~~i <br />`Il?~IEI) -~1~~1) I{E(;1.111i:1'rl(_E\ <br />423 Centennial Duild in g. 1313 Sherman Street <br />Denver. Colorado 80203 Tel (303) 85r,-557 <br />David C. Shelton <br />Director <br />Octobez• 25, 1982 <br />h1r. Bennett Young <br />Office of Surface hfi Wing <br />Brooks Towers <br />2020 ISth Street <br />Denver, Colorado 80202 <br />RE: Stipulations I and 3 of the Blue Ribbon /line Proposed Decision <br />and Findinys of Compliance <br />Dear Mr. Young: <br />This letter will document our phone conservation of October 27, 1982. Our <br />discussion concerned the relationship of stipulations in the Blue Ribbon <br />Mine Proposed Decision and Findings of Compliance to the stability of the <br />haul road and adjacent colluvial body. The purpose of stipulations 1 and <br />3 is to assure that the bench and haul road remain stable duriny mining <br />operations and after reclamation. Reyardiny the specific concern for the <br />stability of the colluvial body above the se~~itchback in the haul road, it <br />is the Division's intent that these stipulations wi.7l ensure the necessary <br />slope treatment to ensure stability duriny and after mining. The time <br />frames set forth in each stipulation will ensure that this issue is resolved <br />expeditiously. <br />If you have any further questions regarding this issue or the Blue Ribbon <br />Mine, please contact me. <br />Sincerely, <br />F.LB:ys <br />~ % ~~%c <br />r; ~ <br />Edcl~ard L. Bischoff <br />i <br />Senior Reclamation Speca List <br />~ „/~ <br /> <br />