My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45818
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:16:11 PM
Creation date
11/23/2007 2:07:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
5/4/2004
Doc Name
Well 20-74 and Temporary Cessation Status
From
DMG
To
American Soda LLP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 40 <br />Hazel Rock/Metal Mining Rule I <br />1.14 <br />1.13.9 Ten `Year Limitation for Tbmporary Cessation <br />]:n no case shall Temporary Cessation be continued for more than ten (10) yeazs <br />wiWout terminating the mining operation and fully complying with the Reclamation <br />and Environmental Protection Plan requirements of the Act and these Rules. <br />TERMINATION <br />- -1,14.1 Permit Termination - - - - - - - <br />103(6)(a)(1V) (1) Apermit granted pursuant to these Rules shaIl continue in effect as long <br />as: <br />(a) the Boazd does not take action to declare termination of the <br />life of the mine, which action shall require a sixty (60) day notice to the <br />Operator alleging a violation of the permit, the Act or Rules; or <br />(b) there is a discontinuance of the mining operation with a <br />Temporary Cessation filing as provided in 1.13.5 or 1.13.7; or <br />(c) there is no failure to .submit the reports required under <br />Subsection 1.13.5 and 1.13.7; or <br />(d) there is no failure to comply with the requirements of Rule <br />1.13.8. <br />(2) ]n the event the Operator is not in compliance with the provisions of <br />Subpazagraph 1.14.1(1), the Boazd shaII provide a reasonable opportunity for the <br />Operator to meet with the Boazd to present the fuIl case and further provide <br />reasonable time for the Operator to bring violations into compliance. Such hearings <br />and procedures shall be in compliance with the requirements of Subsection 3.3.2; or <br />at such hearings the Boazd may: <br />(a) declare termination of the life of the mine according to the <br />provisions of this Rule and after finding a violation in accordance with <br />Subsection 3.3.2; or <br />(b) declare that a mining operation is in a state of Temporary <br />Cessation, establishing a commencement date, as necessary, according to a <br />review of the facts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.