My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45795
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:16:09 PM
Creation date
11/23/2007 2:06:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
General Documents
Doc Date
5/3/1990
Doc Name
ANALYSIS OF FINAL DESIGN ANALYSIS FOR HR-6 SNYDER QUARRY CAP PROPOSAL CASTLE CONCRETE CO SNYDER QUAR
From
GORSUCH KIRGIS CAMPBELL WALKER & GROVER
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • ~oiiiiiiiiiiiiiiuiii <br />G ORSUC H, KIRGIS, CAMPBELL, WALKER, AND GROVER <br />ATTORNEYS AT LAW ,.)~,~I <br />_ eti~a=r~n~l ril~~l.., <br />101 N. CASCADE AVE. <br />SUITE 310 <br />THOMAS M JAMES COLORADO SPRING S, COLORADO <br />TAMMY W AKER9 60903'1622 <br />ANNE T. KELSON <br />TELEPHONE (>I91 633-6061 <br />DENVER LINE (3031 620-9020 <br />TELECO PIER (ll9) 635-6<61 <br />May 2, 1990 <br />Mr. Daniel I. Hernandez <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RT~1 DENVER OFFICE <br />,",..`~ 'T ~ ~ `~ ~ y ~ENTEENTH ST. <br />~/.lyJGiJ1 b, f t/J I o <br />b I"'~ X 19180 <br />+ DENVER, CO 60219 <br />1 AY ~) ~ .~ ~' 1.303) 59 N 200 <br />nn~A, nn11f~ (t1`~j~ ~~ qq TELECO PIER <br />1Y1 I1tlLV V~I~~i_. 1303) 296-0215 <br />Re: Analysis of "Final Design Analysis for HR-6 Snyder Quarry <br />CAP" Proposal, Castle Concrete Company, Snyder Quarry, <br />Permit No. M-77-210 <br />Dear Mr. Hernandez: <br />I am writing in response to your April 13, 1990 letter <br />directed to Obering, Wurth & Associates in connection with the <br />above-referenced proposal. As I have indicated to you during our <br />prior telephone conversation, this firm represents four of the five <br />Lenders who now own a substantial portion of the property known as <br />Cedar Heights Subdivision, Colorado Springs, Colorado. <br />I received a copy of the Final Design Analysis for HR-6 Snyder <br />Quarry CAP on March 21, 1990. A consulting engineer has been <br />retained to review the options contained in that proposal, as well <br />as the additional options outlined in the Mined Land Reclamation <br />Division Memorandum from John T. Doerfer to Dan Hernandez dated <br />April 4, 1990. I anticipate that it will take a week to two weeks <br />before I will have the results of our. consulting engineer's review. <br />After I have had an opportunity to discuss the consulting <br />engineer's review with my clients, I will contact Castle Concrete <br />Company to advise it of the Lenders' position on the options <br />outlined in Castle Conrete Company's proposal as well as the <br />additional options detailed in the MLRB Memorandum dated April 4, <br />1990. <br />Should you have any questions regarding any of the above, <br />please feel free to give me a call. <br />
The URL can be used to link to this page
Your browser does not support the video tag.