Laserfiche WebLink
of a minimum 6 inches. All stockpiled topsoil has been redistributed. The proposed <br />operation is in compliance with the requirements of this section. <br />V <br />VI. <br />VII. <br />Information regarding topsoil can be found in Section 2.04.9 of Volume I, Appendix E <br />of Volume II and Appendix I of Volume III of the perntit document. <br />Sealing of Drilled Holes and Underground Openings <br />All drill holes, with the exception of the existing monitoring well, have been sealed as <br />required in Rule 2.05.4(2)(g) and 4.07. Information regarding sealing of drilled holes <br />and underground openings is found in Volume I, Section 2.05.4 of [he pennit <br />application. <br />The operation is in compliance with the requirements of this section. <br />Use of Explosives <br />No explosives will be used in the furore reclamation operations. Reductions of the <br />highwalls were performed by scrapers and dozers and no blasting of overburden was <br />required. Information on explosives is found on pages 44-49 of Volume I of the permit <br />application. <br />No specific approvals are required in this section. This mine is in compliance with this <br />section. <br />Disposal of Excess Spoil and Underground Development Waste <br />A disposal plan for excess spoil and underground development waste was not proposed. <br />This mine did not produce excess material. <br />No specific approvals are required in this section. This mine is in compliance with this <br />section. <br />Canadian Strip Mine, C-81-026 23 December 5, 1996 <br />