Laserfiche WebLink
• <br />Synopsis of Events <br />(As of 8/24/92) <br />Property: Cash Mine and Mill <br />Operator: Gold Hill Ventures and Colina Oro Molino, Inc. <br />Permit No: M-83-141 <br />County: Boulder <br />7/15/92 Co-permittees paid the remaining 511,685.00 due on the civil penalty <br /> associated with NOV #M-92-021. <br />7/16/92 Division bond re-evaluation inspection of the site. <br />7/29/92 Remaining civil penalties on NOV #M-92-028, 029, 030 paid in full <br /> (total = 517,500.00) <br />7/31 /92 Mr. Tatman said water well hole has been drilled. Mr. Steen will file <br /> the final technical revision on the permit boundary adjustment. <br />8/5/92 Division Inspection -permitted water pumping scheme in place and <br /> functional. Still require the TR which shows the measured <br /> adjustments to the permit boundaries as promised in Mr. Steen's <br /> 6/22/92 letter to the Division. <br />8/11!92 Talked to both co-permittees about what is necessary to get C & D <br /> lifted -referred to Division's letter of 6/29/92. There are four <br /> conditions. Wayne & Gwen did not receive the letter. Mark did - <br /> Mark gave a copy to Wayne, Wayne faxed one to Gwen. Division re- <br /> mailed the letter to the three parties. <br />8/19/92 Division meeting with three representatives of Gold Hill Ventures and <br />COM, Inc. All conditions of the four Board Orders had been satisfied <br />with the submission of the final technical revision today. The Cease <br />and Desist Order was lifted on the site. Discussed COM, Ines <br />request for reconsideration of NOV #M-92-021. <br />W CY/yj b <br />m:\oss\yjb\synopsis <br />