Laserfiche WebLink
III IIIIIIIIIIIII III <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl o(Nalural Resources <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />Vhone. 130}I 8663567 <br />FAX: 13031 8 3 2-85 06 <br />November 30, 1993 <br />W.D. Corley <br />The Corley Company <br />P.O. Box 1821 <br />Colorado springs, CO 80901 <br />RE: G.E.C.- Orphan Pit- Bond Revocation Project <br />RN-COAL-MINES-8 <br />Dear Dr. Corley, <br />OF'~~L. <br />,,F <br />Ne <br />:816 ~ <br />Roy Romer <br />Governor <br />Michael B.long <br />Division Director <br />The purpose of this letter ie to inform the Corley Company of the minor changes <br />made to the G.E.C.- Orphan Pit- Bond Revocation Project RN-GOAL-MINES-8. Field <br />Directives are issued to authorize work changes due to changed conditions within <br />the scope of the Purchase Order Contract. Changes to the contract have occurred <br />and are ae follows: <br />1. The east-west drainage at the Duck Pond Pit has been revised to <br />allow for ponding of water at the base of the pit. This ponding area will <br />eventually silt in naturally allowing for positive drainage. This change <br />was necessary because the drainage channel leaving the east aide of the <br />pit ie 5 to 6 feet higher than the drainage entering the west aide of the <br />pit. Therefore, positive drainage across the pit could not be <br />accomplished without major disturbance to the incoming drainage channel. <br />2. The diversion channel down the face of the Duck Pond Pit has been <br />eliminated from the scope of work. Contour furrows will instead be <br />established every 50 to 75 feet down the face of the Duck Pond Pit. These <br />contour furrows will direct water off of the face of the Duck Pond Pit <br />into the natural drainages. <br />3. Roughly half of the coal material located to the north of the Orphan <br />pit will be placed in the small pit north-west of the Orphan pit and will <br />be backfilled with spoil material. This will essentially reclaim an area <br />not previously included in the reclamation plan. All elope requirements <br />and topsoil specifications stated for the Orphan pit will apply to this <br />area. <br />Please note that there will not be an increase in the contract price as a result <br />of these changes. The project completion time has been extended to December 5, <br />1993. weather conditions may also extend the completion date. <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />~~ S Cw~/`'-~~~ <br />Erica S. Croaby~ ~/ <br />Project Manager <br />cc: Larry Routten <br />STATE OF COLORADO <br />m:\coal\esc\gec\931110 <br />