Rooert Snerman, Marx Koro <br />- 2 - Au dust 30, 1984-_ <br />Slopes at the site are steep, and surface run-off is currently controlled py <br />temporary drainage structures: contour furrows and a perimeter ditch. Given <br />the run-off at the two reclaimed pits, the Division would like Rockcastle to <br />project the drainage pattern witnout the temporary structures and prepare a <br />plan to protect the reconstructed topography. This Dlan would probably take <br />the form of design and establishment of one or more permanent stream channels. <br />Satisfaction of Stipulation 5 will be possible upon the receipt of a package <br />containing the following items: <br />Certified "As-Built" topography maps based on surveys of Pit 5 and Pit 6, <br />prepared to the same scale as the reclamation moo (1" = 400'); <br />A demonstration of approximate original contour (AOC) consisting of: <br />a) a comparison of the slopes and drainage characteristics of <br />the reclaimed configuration versus the pre-mine configuration <br />per Rule 1.04.13; <br />b) a geotechnical evaluation of the safety factor of all slopes <br />per Rule 4.14.2(1)(p) and Rule 4.27.3(3); <br />c) erosional stapility of the site per Rule 4.14.2(1 )(b ); <br />d) the compatibility of the reclaimed configuration with the <br />post-mining land use per Rule 4.14.1(2)(0) and; <br />e) the blending of the reclaimed topography with the surrounding <br />terrain per Rule 1.04(13). <br />The Division is quite concerned that Rockcastle decided to halt all field <br />reconnaissance surveys until the bond issue is resolved. On page II.J-12 <br />of the permit application Rockcastle committed to the performance of a <br />vegetation survey by an authority in range management in 1988, This work <br />was not completed properly in 1988. Rockcastle re-committed to preparation <br />of tnis survey during the April 4, 1989 meeting as noted in the Mined Land <br />Reclamation Division review of such on April 10, 1989. Therefore we have <br />an expectation that this work will oe properly completely this year. The <br />Division will pursue an enforcement action if this commitment is not fulfilled <br />tnis summer. <br />Lastly, I have modified my field scnedule during the month of September <br />following RocKCastle's decision to pursue the formal public hearing at a later <br />date. Please call to arrange a meeting which we can all attend. <br />S/i/nlcerely, / ~ <br />( V ~ ~~~i~10 L "V ~~~ <br />Catnerine W. Begej ~ <br />Reclamation Specialist <br />CWB/ern <br />930 2r <br />