Laserfiche WebLink
iiiiiiiuiiiiiiiiu <br />999 <br />TATS OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />Fn x: 303 832-8106 <br />i.- <br />+; ~ . . <br />ocr o 2 ~ssz <br />Divisi~:.,. ~ ~- <br />MINING PERMIT - COAL <br />oF' ~O<o <br />a~'=' <br />„` Q~`~ <br />•~(a~Q• <br />r ~".',~' <br />~ rB76 ~ <br />Ray Romer, <br />Gaverrar <br />Michael B. lorg, <br />Division DIfBQar <br />Permit Date: November 16, 1991 Permit No. C-80-001 <br />Permit Expiration Date: November 16, 1996 <br />THIS PERMIT is issued by the Office of Mined Land Reclamation, Division of <br />Minerals and Geology, Department of Natural Resources, State of Colorado. <br />RECITALS <br />I. Pittsburg & Midway Mining Company ("operator") desires to conduct a <br />mining operation known as the Edna Strip Mine for the purpose of extracting <br />coal. <br />II. On September 12, 1992, the Division of Minerals and Geology ("the <br />Division") approved the operator's application for this permit, fixed the <br />amount of bond and directed that this permit be issued upon the filing with <br />the Division of bond in the amount so fixed in form and substance approved by <br />the Division, and such bond has been so furnished. <br />III. On July 28, 1992, the Division made the following findings: <br />(a) The permit application is accurate and contains all information <br />required under C.R.S., 34-33-101 et sec. and regulations promulgated <br />thereunder and that all the requirements of Article 33 of Title 34, C.R.S. <br />("such article") for the issue of a permit have been complied with; <br />(b) The applicant has demonstrated that reclamation as required by such <br />article can be accomplished under the reclamation plan contained in the permit <br />application; <br />(c) The assessment of the probable cumulative impact of all anticipated <br />mining in the area on the hydrologic balance specified in Section <br />34-33-110(2)(1) has been made by the Division and the proposed operation <br />thereof has been designed to prevent material damage to the hydrologic balance <br />outside the permit area; <br />(d) Granting the permit will not conflict with any designation decision <br />issued pursuant to Section 522 of the Federal "Surface Mining Control and <br />Reclamation Act of 1977", as amended, (P.L. 95-87), nor is the area proposed <br />to be mined within an area under study for unsuitability designation in an <br />administrative proceeding commenced pursuant to Section 34-33-126 or <br />Section 522 of said P.L. 95-87. <br />