My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45535
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:58 PM
Creation date
11/23/2007 1:55:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
General Documents
Doc Date
1/19/1993
Doc Name
RIMROCK COAL CO, RIMROCK COAL MINE PN C-89-074 PROPOSED CHANGE IN OPERATIONS
From
DMG
To
LANDMARK RECLAMATION INC
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />pF'~O <br />Department of Natural Resources ,,:~ o <br />Ne .: <br />1313 Sherman 51., Room ? 15 ~ . r1 ~ Q , <br />Denver, CO 80203 • ~r.•~ <br />Phone: 13031 866.3567 ravc • <br />FAX: (3071 872-8106 <br />Roy Romer <br />Governor <br />January 19 , 1993 h,icnael s. tong <br />Din sion Direcror <br />Mr. Mark Kerr <br />Operations Manager <br />Landmark Reclamation, Inc. <br />4901 South Windermere Street <br />Littleton, CO 80120 <br />RE: Rimrock Coal Company, Rimrock Coal Mine, Permit No. C-89-074, <br />Proposed Change in Operations <br />Dear Mr. Kerr: <br />In response to your letter of January 12, 1993, the Division has <br />determined that a permit revision, rather than a technical revision, <br />would be required to change the method of mining from a strip mine to <br />a punch mine. <br />Rule 1.04(90) states that a permit revision is required if there is a <br />significant change in the terms or requirements of the permit. <br />Rule 1.04(136) states that a technical revision is required if there <br />is a minor change to the permit. The proposed punch mine operation <br />will require an extensive and lengthy review before approval can be <br />considered. A complete analyses of potential subsidence problems will <br />need to be made. MSHA will need time to examine this operational <br />change. Portal closures, reclamation of waste, the change in the <br />reclamation plan for disturbed areas, the change in the operation <br />plans, the change in pertinent maps and the change in bonding would <br />all have to be addressed as well. These changes are substantial, <br />involve other agencies and will require a considerable amount of time <br />to review. <br />If you have any questions, please call me. <br />Sincerely, <br />~ fl~ <br />Joseph J. Dudash <br />Reclamation Specialist <br />JJD/ern <br />cc: Dan Hernandez, DMG <br />Jim Pendleton, DMG <br />M:\oss\ern\C89074.wp <br />
The URL can be used to link to this page
Your browser does not support the video tag.