Laserfiche WebLink
~. <br />~• <br /> 999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY - <br />e co <br />Department of Natural Resources do <br />op <br />~~, <br /> <br />1313 Sherman St.. Room ? 15 N <br />o <br />~ <br />.p ~ ~ <br />, <br />Denver, CO 80203 . <br />. <br />~i <br />Phone: 1707) 866-7567 ` X816 ` <br />FAX:1303)832-8106 <br /> Roy Romer <br /> Governor <br />DATE: December 16 <br />1992 ""`nae'a.`°°R <br />, Dirisi°n Dneclor <br />T0: F i l e C-80-007 <br />/// <br />/// <br />/~ <br />f / <br />I <br />/ <br />FROM: Christine E. JohnstorY ,~~ <br />RE: Outstanding Issues from 1991 West Elk Renewal (Stipulations 44, 45, and 46) <br />Stipulation No. 44: <br />1. Revise Windy Gap policy calculations for annual net water depletion. <br />Coordinate with U.S. Fish and Wildlife Service and provide all information <br />to the division to review and incorporate into permit. An application for <br />a technical revision to include the revised information should be received <br />by December 31, 1992. <br />Stipulation No. 45: <br />MCC will submit the following information by December 30, 1992. <br />1. Maps 56 and 57, Topsoil Removal and Topsoil Replacement Plan, respectively <br />2. Map 53, Distribution of Surface Facilities and Table 47, Approximate <br />Topsoil Volumes (6-1-92; V.2.)* <br />3. Map 54, Sediment Drainage Control Facilities at the West Elk Mine, <br />Table 43, Diversion and Collection Channels and Table 44, Collection Pipes <br />4. As built designs for sediment ponds, freshwater pond, and ditches (6-1-92; <br />Part II.S)* <br />5. As built designs for stack tubes (6-1-92; Part III.16)* <br />6. The amount of gob utilized for the stack tube fill (6-i-92; Part III.16)* <br />7. Drainage configuration for the pad including: <br />location of clean water ditches, sediment ditches, sediment trap and <br />culverts and contours of storage pad. (6-1-92; Part III.16)* <br />8. Final maps from TR-58 to be included in permit application including: <br />Coal Stockout and Reclaim Elevation and sections, Flow Diagram, Site Plan, <br />and Outline Plan - Existing Breaker Support Structures. (6-1-92; <br />Part III.16)* <br />