My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45492
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:53 PM
Creation date
11/23/2007 1:53:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
3/1/2002
Doc Name
Draft Permit
From
EPA
To
American Soda LLP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br /> <br />Mechanicallntegrity'Test ' <br />Casing or Annulus Pressure Mechanical Integrity Test <br />U ~. Ernironmeritnl Protection Agency <br />Untlergrountl Injection Control Frogram <br />cog 15"' Street. Suite 560 Denver, CO 502022665 <br />EPA Witness: _ <br />lest conducted by: <br />Others present: _ <br />Well Name: <br />Field: <br />Location: Sec:^ T _ N / S <br />(tnrratnr[ <br />7}ye: ER SWD Status: AC TA UC <br />R_E / W Count)`: State:_ <br />Last M17: ~ / Maximum Alloy+able <br />PS]G <br />Is this a regularh` scheduled test? <br />Initial test for permit? <br />'rest after well rework? <br />Well injecting during test? <br />Pre-test casing/tubing annulus pressure: <br />( ]Yes [ ] No <br />[ ]Yes [ ] No <br />[ )Yes [ j No <br />[ )Yes [ ] No ItYes. rate: <br />psig <br />bpd <br />M]T DATA TABLE Test ~Il 'rest q2 Test tt3 <br />TUBIA'G PRESSURE <br />]nitial Pressure psig psig psig <br />End of test pressure psig psig psig <br />C,9.SIR'G/TUBING AIVA'ULUS PRESSURE <br />0 minutes psig psig psig <br />5 minutes psig psig psig <br />]0 minutes psig psig psig <br />15 minutes psig psig psig <br />20 minutea psig psig psig <br />25 minutes psig psig psig <br />30 minutes psig psig psig <br />minutes psig psig psig <br />minutes psig psig psig <br />RESULT Pass Fail Pass Fail Pass Fail <br />Does the annulus pressure build back up after the test ? [ j Yes [ j No <br />MECHANICAL INTEGRITY PRESSURE TEST <br />Date: / / <br />Additional comments for mechanical integrity pressure tesi, such as volume of fluid added to annulus <br />and bled back at end of test, reason for failing test (casing head leak, tubing leak, other), etc.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.