Laserfiche WebLink
pemut, or to determine compliance with the permit. The permittee shall also <br />famish to the Director, upon request, copies of records required to be kept by this <br />permit. <br />7. erection and Entrv. The pernrittee shall allow the Director, or an authorized <br />representative, upon the presentation of credentials and other documents as maybe <br />required by law, to: <br />(a) Enter upon the pernrittee's premises where a regulated facility or activity is <br />located or conducted, or where records must be kept under the conditions of <br />this permit; <br />(b) Have access to and copy, at reasonable times, any records that must be kept <br />under the conditions of this pemut; <br />(c) Inspect at reasonable times any facilities, equipment (including monitoring <br />and control equipment), practices, or operations regulated or required under <br />this permit; and <br />(d) Sample or monitor, at reasonable times, for the purpose of assuring permit <br />compliance, or as otherwise authorized by the SDWA, any substances or <br />parameters at any location. <br />8. Records of Permit Application. The permittee shall maintain records of all data <br />required to complete the permit application and any supplemental information <br />submitted for a period of five; (5) yeazs from the effective date of this permit. This <br />period maybe extended by the Director at any time. <br />9. Signatory Requirements. All reports or other information requested by the Director <br />shall be signed and certified according to 40 CFR 144.32. <br />10. Resorting of Noncompliance. <br />(a) Anticipated Noncompliance. The permittee shall give advance notice to the <br />Director of any planned changes in the permitted facility or activity which <br />may result in noncompliance with permit requirements. <br />(b) Compliance Schedules. Reports of compliance or noncompliance with, or <br />any progress reports on, interim and final requirements contained in any <br />compliance schedule of this permit, shall be submitted no later than thirty <br />(30) days following each schedule date. <br />(c) Twenty-Four Hour Reporting. <br />EPA Draft Permit No. CO 10932-04664 <br />Page 21 of 77 <br />