Laserfiche WebLink
Holcim <br />December 6, 2002 <br />Mr. Larry Oehler <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Holcim (US) Inc. Phone 719 784 6325 <br />3500 Highway 120 Fax 719 784 3470 <br />Florence, CO 81226 www.holcim.com/us <br />SUBJECT: Change in Holcim (US) Representative <br />Dear Larry: <br />RECEIVED <br />DEC t .1 2002 <br />Division of Minerals and Geology <br /> <br />This letter serves as an introduction and to let you know that Mike Toelle is now <br />the Interim Quarry Manager for our Portland Plant Facility. In this capacity, Mr. <br />Toelle will be the direct contact and representative for Holcim (US) Inc. in matters <br />relating to permitting issues with the Department of Natural Resources, Division <br />of Minerals and Geology. <br />Mr. Toelle can be reached at (719) 784-1211, FAX # at (719) 784-1213. <br />Please contact me if you have any questions regarding this change. <br />Sincerely, <br />~~~~ <br />Guillermo (Bill) Oropeta <br />Production Manager <br />cc: AI Notary, BBL <br />Mike Toelle <br />Juan Nunez <br />Violet Sykora <br />Roy Stienmier <br />Strength. Performance. Passion. <br />