Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />Mountain Coal Company <br />West Elk Mine <br />Post Once Bore 591 <br />Somerset, Colorado 81434 <br />Telephone 3 03 929 5 01 5 <br />Fex 303 9295595 <br />August 2, 1994 <br />REC;EIIiFr~ <br />AUG a s ]994 <br />Ms. Christine Johnston, Environmental Protection Speciali tllsao of Atlnerdly a Ue~!upy <br />Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />i~ <br />Re: Mountain Coal Company, West Elk Mine, Permit No.C-80-007, Main Substation Road <br />Re-opening. <br />Dear Christine: <br />As per our July 21, 1994, conversation, Mountain Coal Company will be reopening the road that <br />accesses the powerline and the top of the relocated topsoil pile from the main substation. As you <br />may recall, the existing road will be bladed to a width required for concrete trucks to access the <br />topsoil pile so that shotcreting operations can be safely conducted on the ditches around the pile. <br />After completion of the shotcrete operations, the soil and brush will be pulled back and the road <br />closed to vehicle access. The road will then be seeded and mulched. <br />Please don't hesitate to wntact me should you have questions. <br />Si ly, ~ <br />Q <br />eery A. arbe <br />Environmental Coordinator <br />cc: K. Welt <br />subroad.doc <br />° D <br />