Laserfiche WebLink
t:. FACE EQUIPI•iEI:T kND $EC710;1 HAULAGE EQUIPI.IENT ASSOCIATCD WITH EACH: <br />( <br />• <br />1• Continuous Miner - MggIETTA X012 C <br />2. Shuttle Cars - Wanner Teletram MTT-F17-145 <br />3. Roof Drill - Jov RBDB1 <br />4. Battery Scoop - 5 b S 488 <br />5. Auxilliarv Fan - CSE 27" <br />6 <br />0. SEQUENCE OF Pf]tJING AWD INSTALLATION OF SUPPORTS INCLUDING TEh1PORARY <br />SUPPORTS: <br />Dra~~iinas shall be attached showing the maximum width of entries, rooms, <br />inter-sections, crosscuts, and (if applicable) pillar splits; the sequ- <br />ence of support installation--including temporary supports; the spacing <br />of supports; and where applicable the sequence of mining pillars, includ <br />cut sequence in those pillars necessary to establish a unifrom pillar <br /> <br />line that eliminates pillar points and pillars that project inby the <br />breakline. <br />SIGHT LINES SHALL BE ESTABLISHED TO ASSURE THAT MINING PROJECTIONS IN <br />ENTRIES, ROOMS, CROSSCUTS, AND PILLAR SPLITS ARE FOLLOWED. <br />Entry Width 20' Centers 70'- 100' <br />Crosscut Width 20' Centers 80' - 200' <br />P,oom Width Centers <br />RDDm Crosscut Width <br />Cente <br />Slope Width (anthracite) <br />Gangway Width (anthracite) <br />5 <br />