My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45258
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:14 PM
Creation date
11/23/2007 1:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
12/9/1994
Doc Name
GEC EAST PIT PROJECT C-81-037 RN-MINES-322
From
DMG
To
COLO WEST LEASING
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />The Corley Company <br />Pone 6325050 P.O. Box 1821 <br />COLORADO $PRING$ COLORADO 60901 <br />Nov. 18, 1994 <br />Mr, Jim McArdle <br />Division of Minerals & Geology <br />1313 Sherman St. <br />Denver CO 80203 <br />Dear Mr. McArdle; <br />i <br />RECEIVED <br />NOV 21 19~+ <br />pivision or rnmerais & Geology <br />The Corley Company would like to make the following formal complaints <br />concerning the GEC East Pit work. <br />1. The westerly slope of Chen's Hill and the northerly slope of the hill <br />between the East and West Pits are steeper than 3:1 H:V. <br />2. There is almost no topsoil on the westerly slope of Chen's Hill. <br />3. The drainage ditch along the road at the toe of Chen's,liill has not <br />functioned adequately. This ditch has become completely filled with silt <br />near the entrance gate eaith most of the water and sediment entering Energy <br />Fuel's sediment pond. The silt deposition is sufficient to cover the first <br />strand of barbed wire on the fence on the west side of the road. <br />4. The silt deposition on the road will probably close the road during next <br />year's rains. <br />5. The road has nearly been washed out near the East Pit because of <br />inadequate provision for water to cross the road. <br />6. The entrance gate was damaged by the construction machinery, and we have <br />asked the contractor to replace the gate. <br />7. The entrance ga*_e post was removed by the contractor. He did net replace <br />the post correctly, reyuiring that the post support be bent to connect to the <br />post. The post needs to removed again and reset with the correct <br />positioning. <br />8. The contractor's dozer was parked for an extended time outside the gate. <br />The dozer has leaked a considerable amount of oil that should be removed. <br />9. Most of the concrete structures have not functioned. Most were not <br />installed ccrrectly. <br />Sincerely, <br />W <br />W.D. Corley, . <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.