Laserfiche WebLink
<br />Followup to NOV C-93-73: <br />Followup to NOV C-93-77: <br />1. Prevent untreated runoff <br />from entering undisturbed <br />areas. <br />2. Prevent untreated runoff <br />from leaving permit area. <br />3. Approvable revision to <br />Division. All by June 15, <br />1993. <br />1. Repair South Collection <br />Ditch to conform to <br />approved specifications by <br />June 15, 1993. <br />2. Repair all impacted off site <br />areas (within and outside <br />of permit area) by June 30, <br />1993. <br />3. Submit approvable revision <br />for design of south <br />Collection Ditch by June <br />30, 1993. <br />4. Repair and stabilize <br />natural channel portions of <br />South Collection Ditch. <br />5. Repair 100 year ditch <br />around Section 16 Excess <br />Spoil Pile by June 30. <br />