Laserfiche WebLink
' r <br />Golden Eagle Mine <br />NW-1 Exhaust Ventilation Shaft Construction <br />75.200 Roof Control Plan Amendment <br />General Description: <br />The NW-l shaft will be constructed by raise boring to the full <br />diameter of 9 feet 3 inches and lined to approximately 8 feet. <br />The shaft will be located in the bleeder entries of the <br />Northwest longwall panels. <br />Preparation: <br />The shaft bottom area will be developed with a continuous <br />miner as part of the mine development and supported with fully <br />resin grouted 3 foot roof bolts. To facilitate the zssembly <br />of the raise head, the shaft bottom will require an excavation <br />approximately 12 feet x 12 feet x 8 feet high (minimum). The <br />excavation will be accomplished by continuous miner. The top <br />of the excavation will be bolted with mechanical roof bolts <br />(specifications located in the approved Roof Control Plan). <br />The roof bolt pattern for the top of the raise head assembly <br />area will be 4 feet by 4 feet with 5 foot roof bolts. The <br />mechanical roof bolts and plates will require removal prior to <br />reaming. Removal of the mechanical bolts will be accomplished <br />by setting a prop immediately adjacent to the bclt prior to <br />its removal. The props will be set on the reamer head and <br />will fall out when the reamer head is rotated6. The <br />installation and removal of the roof bolts will be from <br />beneath supported roof. The brow at each approach will be <br />knocked off, creating a air sweep. The anticipated dimensions <br />are less than 2 feet vertical by 2 feet horizontal. <br />Drawing attached (Roof Solt Pattern - Raise Head Assembly <br />Area). <br />Shaft Excavation: <br />During the excavation or reaming phase, the shaft bottom will <br />contain cuttings to be removed by diesel scoops or continuous <br />miner and shuttle cars. The .minimum distance from the <br />vertical shaft wall to the operator will be 8 feet. This will <br />prevent the raise bore from becoming muck bound and eliminate <br />the operator from exposure to falling cuttings. The cuttings <br />will not be allowed to accumulate in the shaft bottom. The <br />cuttings will be permanently stored underground near the shat*_ <br />bottom (identified on map). ido combustible material (coal) <br />will be stockpiled underground. To prevent interruptinc <br />ventilation in the stockpile areas, the muck will not be <br />allowed to roof out. <br />} <br />/ ~. Revised i(18/91 ~~~~(~~~~ (~~~ D L1 ~~~ i t ~ '• J ~~ <br />