Laserfiche WebLink
RFCFINF_L <br />SEP 0 6 199 <br />RIDER TO MINING PERMIT <br />C'~rs cn o. r,{~r.eraa c ~s~~c2y <br />Permit Date: July 30, 1994 Permit No: C-81-014 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. 4 <br />WITH RESPECT TO THAT PORTION OF THE COAL LOAD-OUT LOCATED WEST OF THE <br />COUNTY ROAD 79 IDENTIFIED AS AN ALLUVIAL VALLEY FLOOR, WITHIN TWO YEARS <br />AFTER THE COMMENCEMENT OF THE PERIOD OF EXTENDED LIABILITY AS SPECIFIED <br />IN RULE 4.15.7(5) THE OPERATOR SHALL COMPARE THE SOIL CHARACTERISTICS <br />OF THE RECLAIMED AREA WITH AN ADJACENT UNDISTURBED AREA. THIS <br />COMPARISON SHALL BE SUFFICIENT TO VERIFY THAT THE INFILTRATION, <br />PERMEABILITY, AND TEXTURAL CHARACTERISTICS OF THE RECLAIMED SOILS HAVE <br />BEEN REESTABLISHED SUFFICIENTLY TO RENDER THE AREA AS POTENTIALLY FLOOD <br />IRRIGABLE. <br />Stipulation No. 9 <br />THE OPERATOR SHALL POST AND MAINTAIN "STEEP SLOPE CAUTION SIGNS" ALONG <br />THE ACCESS ROAD TO THE REFUSE DUMP. TWO MONTHS PRIOR TO ABANDONMENT <br />AND RECLAMATION OF THE ACCESS ROAD, THE OPERATOR SHALL SUBMIT <br />APPROPRIATE GEOTECHNICAL STABILITY ANALYSIS TO DEMONSTRATE COMPLIANCE <br />WITH THE STABILITY REQUIREMENTS OF RULES 4.03.2(3)(c)(i) OR (d)(viii); <br />OR IN THE ALTERNATIVE, THE OPERATOR SHALL SUBMIT A PROPOSED RECLAIMED <br />CONFIGURATION WITH APPROPRIATE STABILITY ANALYSES TO DEMONSTRATE <br />CONFORMANCE WITH THE REQUIREMENTS OF RULE 4.03.2(7). <br />Stipulation No. 12 <br />PRIOR TO AFFECTING THE LAND IN THE SOUTHWEST 1/4 SECTION 23, TOWN- <br />SHIP 20 SOUTH, RANGE 70 WEST, THE OPERATOR SHALL SUBMIT RIGHT-OF-ENTRY <br />INFORMATION FROM THE OWNER. <br />Stipulation No. 14 <br />PEAK FLOW SHALL BE MEASURED <br />CURRENT MONITORING STATION. <br />BE SUBMITTED QUARTERLY AND <br />THE MINE. <br />IN MAGPIE CREEK ON A QUARTERLY BASIS AT THE <br />DATA ACQUIRED FROM THIS MONITORING SHALL <br />INCLUDED IN THE ANNUAL HYDROLOGY REPORTS FOR <br />Stipulation No. 15 <br />THE OPERATOR SHALL MONITOR FLOWS IN SECOND ALKALI CREEK SO AS TO <br />MEASURE MINIMUM AND MAXIMUM FLOWS DURING EACH QUARTER FOLLOWING <br />APPROVAL OF PERMIT REVISION N0. 1. DURING THE MONITORING YEAR, AT <br />LEAST ONE GRAB SAMPLE SHALL BE COLLECTED WHEN STREAMFLOW IS PRESENT. <br />THIS SAMPLE SHALL BE SUBMITTED FOR LAB ANALYSIS FOR TOTAL DISSOLVED <br />SOLIDS, TOTAL SUSPENDED SOLIDS, pH, TOTAL DISSOLVED IRON AND <br />MANGANESE. RESULTS OF THESE ANALYSES SHALL BE SUBMITTED TO THE <br />DIVISION WITHIN 60 DAYS FOLLOWING THE END OF THE FIRST MONITORING YEAR, <br />WHICH ENDS ON JUNE 30, 1992. <br />