Laserfiche WebLink
PIKES PEAK MININ~OMPANY <br />Operations Office <br />P.O. Box 191 2755 State Highway 67 <br />Victor, Colorado 80860 <br />(719) 689-2977 • FAX (7191689-3254 <br />December 9, 1994 <br /> <br />• iii iiiiiiiiniiiiii <br />999 <br />Enplawood Office <br />5251 DTC Parkway, Suite 700 <br />Englewood, Colorado 80111 <br />(303] 889-0700 • FAX (303] 889-0707 <br />HAND DELIVERED <br />Mr. Berhan Keffelew RECEIVED <br />Environmental Protection Specialist Utl, Q 9 1994 <br />Colorado Department of Natural Resources <br />Division of Mines and Geology Olwelon v~ mmorela e, ptlnlu <br />Office of Mined Land Reclamation 8y <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Reference: Cresson Project• Permit M-80-244: RecLuest For Specification Adjustment For <br />Select Drain Cover Fill -Addendum. <br />Dear Mr. Keffelew: <br />The Cripple Creek & Victor Gold Mining Company ("CC&V") wishes to confirm, as was <br />discussed with you today, that it is aware that a small amount of fines will be generated through <br />the Select Drain Cover Fill during the very early stages of fluid circulation. CC&V fully <br />expects this to happen and has experienced it in the past with no detrimental effects on either <br />pump screens or pumps. We have not experienced plugging of the riser pipe perforations and <br />expect no adverse effects with this material given the small percentages as well as the small <br />volume of Select Drain Cover material involved. The amount of fine material involved is, again <br />in our experience here and elsewhere, minimal and will have no long-term effects on either <br />production or reclamation. <br />E. Hardaway <br />eer Environmental Affairs <br />FILE: CC&VSTIP.003 <br />